Loading...
HomeMy WebLinkAboutARB201200043 Review Comments Miscellaneous Submittal 2012-06-08ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 June 8, 2012 Joey Blackwell c/o Enloe Inc. 1604 Hampton Ave. N.W. Aiken, SC. 29801 RE: ARB- 2012 -43: Super Test Sunoco Canopy (Tax Map 70, Parcel 14D) Building Permit Review Dear Joey: I have reviewed the plan with revision date of 5/30/12 submitted for the above - referenced project. The changes included in this plan satisfy the outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. This does not include approval of the "SUNOCO" channel letter and vinyl letter signs on the canopy or the freestanding monument sign. Those proposals are being reviewed as part of ARB 2012 -19 and still have outstanding issues that have not been addressed. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. 2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can delay the signing of mylars and the approval of building permits. It is in the applicant's best interest to notify ARB staff of such changes and to initiate the review of amendments to ARB- approved plans to avoid future delays. 3. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3 years. Applicants requesting an extension of the period of validity must do so in writing. The letter must be received by the Director of Planning prior to the expiration date. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Planner cc: Imperial Oil Company Inc. 205 S. Hoover St., Suite 400 Tampa, FL 33609