Loading...
HomeMy WebLinkAboutSDP201200030 Review Comments Preliminary Site Plan 2012-06-08`J I1 pJ11 �11'] �J, r, �) ifilly Service Authority TO: Megan Yaniglos FROM: Alexander J. Morrison, EIT, Civil Engineer DATE: June 11, 2012 RE: Site Plan Technical Review for: SDP - 2012 - 00030: Estes Park — Preliminary TMP# 03200000003300 TMP# 03200000003400 The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 6 inch water line is located approximately 10' distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately 5' distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting construction approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • Show waterline connection at Moubry Lane. • Label Moubry lane waterline as 8" DIP. • Correct note for existing waterline in "Public Road D" to 6" DIP. • Final water and sewer construction plans will be required for review and approval by ACSA. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org