Loading...
HomeMy WebLinkAboutSUB201200074 Review Comments Final Plat 2012-06-21Ellie Ra From: Alex Morrison [amorrison @serviceauthority.org] Sent: Thursday, June 21, 2012 4:51 PM To: Ellie Ray Cc: jlynn @serviceauthority.org Subject: SUB201200052, SUB201200071, SUB201200074: Old Trail Creekside III, Phases 213-1, 1113-2 and IIC Final Ellie, I have reviewed the 3 subdivision plats and am providing comments for both the process to get approval on all 3 as well as comments on each plat. The process will be as follows: 1. Make corrections to 2B -1. 2. Get ACSA approval. 3. Record 213-1. 4. Make corrections to II13-2 and update DB and Page information from 213-1. 5. Get ACSA approval. 6. Record II13-2. 7. Make corrections to IIC and update DB and Page information from II13-2. 8. Get ACSA approval. 9. Record IIC. This process is required because each plat requires DB and Page information from the previous plat before it can be approved by the ACSA for recordation. Individual plat comments are as follows: 213-1 • Update all blanks DB and Page sections on water and sewer easements. • Update blank DB and page for private lateral easement. • Make sure all sanitary sewer easements are labeled with sanitary sewer and not utility. IIB -2 • Update all blanks DB and Page sections on water and sewer easements. • Update blank DB and page for private lateral easement. • Make sure all sanitary sewer easements are labeled with sanitary sewer and not utility. IIC • Change label 6 from utility to sanitary sewer. • Call out water meter easements as note 3 instead of note 5. • Update all blanks DB and Page sections on water and sewer easements. • Make sure all sanitary sewer easements are labeled with sanitary sewer and not utility. Alexander J. Morrison, EIT Civil Engineer 1le49Q,rk (nniy Service Authbriti 168 Spotnap Road Charlottesville, VA 22911 Office: (434)977-4511 EXT: 116 1 This email may contain confidential information that should not be shared with anyone other than its intended recipient(s).