WPO201200040 Review Comments Bond Estimate 2012-06-13 (3)
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Stillhouse Pump Station and Pipeline PROJECT NUMBER: WPO201200040 DATE OF ESTIMATE: 06/06/12 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.8 1500 1200 SILT FENCE LF 2000 5 10000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 1 500 500 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 1 200 200 EC -2 & 3 DITCH PROTECTION LF 800 10 8000 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 6 30 180 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 subtotal 24080.00 project management 3612.00 subtotal 27692.00 CONTINGENCY LS 10% 2769.20 TOTAL 30461.20 BOND AMOUNT REQUIRED 30500.00