HomeMy WebLinkAboutSUB201200061 Review Comments Bond Estimate 2012-06-20Dunlora Gates Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed % compete cost remaining Townbrook Crossing to Towl 11 +55.36 to 16 +8( road length 525.3 ft 1 aggregate base 6.0 in d 525.3 ft L 18.0 ft W 175.1 cy $35.91 $6,287.60 0% $6,287.60 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 0.0 in d 525.3 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 4 asphalt surface 1.5 in d 525.3 ft L 18.0 ft W 66.2 tons $81.90 $5,420.57 0% $5,420.57 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 0.0 ft $13.83 $0.00 0% $0.00 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 5' width 460.0 ft $15.75 $7,245.00 0% $7,245.00 10 ramp CG -12 0 $315.00 $0.00 0% $0.00 11 street name sign 1 $65.00 $65.00 0% $65.00 12 traffic control sign 1 $49.35 $49.35 0% $49.35 13 Street Landscape 0 Each 0 $105.00 $0.00 0% $0.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 8 $1,365.00 $10,920.00 0% $10,920.00 16 pipe, rcp (15 to 48 ") 15.0 in d 3 ES -1,2 $250 3 EC -1 $200 600.0 ft $23.10 $15,210.00 0% $15,210.00 17 pipe, rcp (15 to 48 ") 48.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $126.00 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 0 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 1.0 cy fill 1.0 cy cut 1.0 cy bal $3.15 $6.30 0% $6.30 24 CBR tests (1 every 0.1 mi. per road) 525.3 ft L 1.051 inc of 500' 2 $157.50 $330.75 0% $330.75 25 as -built drawings (1 k+ price per 0.1 525.3 ft L 0.099 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 525.3 ft L 0.099 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 525.3 ft L 0.099 mi. 2 Lanes $2,000.00 $3,979.39 0% $3,979.39 29 VDOT maintenance fee (1 In rd, 1 yr) 525.3 ft L 0.099 mi. 2 Lanes $150.00 $298.45 0% $298.45 30 VDOT admin. Cost recovery fee(1 lar 525.3 ft L 0.099 mi. 2 Lanes $100.00 $448.97 0% $448.97 cost sum $54,361.39 $54,361.39 proj mgmt $8,154.21 $8,154.21 contingency $6,251.56 $6,251.56 Total $68,770 $68,770 6/20/2012 Dunlora Gates Subdivision Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed % compete cost remaining Townbrook Court 10 +83.11 to 12 +T road length 190.4 ft 1 aggregate base 6.0 in d 190.4 ft L 18.0 ft W 63.5 cy $35.91 $2,278.49 0% $2,278.49 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $6.30 $0.00 0% $0.00 3 asphalt base 0.0 in d 190.4 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 4 asphalt surface 1.5 in d 190.4 ft L 18.0 ft W 24.0 tons $81.90 $1,964.30 0% $1,964.30 6 curb CG -2 0.0 ft $8.40 $0.00 0% $0.00 7 curb CG -6 0.0 ft $13.83 $0.00 0% $0.00 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $73.50 $0.00 0% $0.00 9 sidewalk, concrete 5' width 240.0 ft $15.75 $3,780.00 0% $3,780.00 10 ramp CG -12 0 $315.00 $0.00 0% $0.00 11 street name sign 1 $65.00 $65.00 0% $65.00 12 traffic control sign 2 $49.35 $98.70 0% $98.70 13 Street Landscape 0 Each 0 $105.00 $0.00 0% $0.00 13 guardrail 0 ES @ $3700 0.0 ft $16.80 $0.00 0% $0.00 14 manhole or drop inlet 1 $1,365.00 $1,365.00 0% $1,365.00 16 pipe, rcp (15 to 48 ") 15.0 in d 4 ES -1,2 $250 2 EC -1 $200 130.0 ft $23.10 $4,403.00 0% $4,403.00 17 pipe, rcp (15 to 48 ") 48.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $126.00 $0.00 0% $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 0% $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 0% $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 0% $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 0% $0.00 22 E &S fabric,EC -2,3 0 ft L 4 ft W 0.0 sy $10.50 $0.00 0% $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 0% $0.00 24 grading (per cy for cut or import only 1.0 cy fill 1.0 cy cut 1.0 cy bal $3.15 $6.30 0% $6.30 24 CBR tests (1 every 0.1 mi. per road) 190.4 ft L 0.381 inc of 500' 1 $157.50 $220.50 0% $220.50 25 as -built drawings (1 k+ price per 0.1 190.4 ft L 0.036 mi. 1 $1,050.00 $2,050.00 0% $2,050.00 26 survey and layout (price per 0.1 mi.) 190.4 ft L 0.036 mi. 1 $525.00 $1,525.00 0% $1,525.00 27 mobilization 1 $525.00 $525.00 0% $525.00 28 VDOT surety (1 lane) 190.4 ft L 0.036 mi. 2 Lanes $2,000.00 $1,442.05 0% $1,442.05 29 VDOT maintenance fee (1 In rd, 1 yr) 190.4 ft L 0.036 mi. 2 Lanes $150.00 $108.15 0% $108.15 30 VDOT admin. Cost recovery fee(1 lar 190.4 ft L 0.036 mi. 2 Lanes $100.00 $322.10 0% $322.10 cost sum $20,153.59 $20,153.59 proj mgmt $3,023.04 $3,023.04 contingency $2,317.66 $2,317.66 Total $25,500 $25,500 6/20/2012