Loading...
HomeMy WebLinkAboutSDP200700155 Review Comments Final Site Plan and Comps. 2012-07-27Phone 434 - 296 -5832 County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Robert B. Mckee From: Christopher P. Perez, Senior Planner Division: Zoning and Current Development Date: July 27, 2012 Subject: SDP 2007— 00155 Shadwell Market —Final Site Plan Fax 434 - 972 -4126 The County of Albemarle Division of Current Development Planner will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions maybe added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision /Zoning Ordinances unless otherwise specified.] 1. [18- 32.5.7 & 17 -403] A Tier III Groundwater Assessment is required to be completed before the final site plan can be approved. Since the previous review /comment letter was sent the fee schedule has been modified, the current Tier III fee is $510, please submit the fee and the assessment. The County Engineer/ Engineering Department will be your contact for this requirement. Rev 1) While we received the Tier 111 Groundwater Assessment with the recent resubmital, we have yet to receive neither the review fee nor the application. The Engineering Dept is your contact for this document. Please work with them to assure this requirement is met. 2. [Comment] Previously on sheet 5 an easement to construct the septic drainfield was depicted on TMP 79- 7. Why has this been removed from the current plan? Without the easement how does the applicant propose the septic drainfields be installed? Rev 1) It has been noted that there is an agreement between the two property owners. Please provide the access agreement or provide letter(s) of intent to grant them from the off- site property owner. 3. [Comment] On sheet 7 of 12, in the Luminaire Schedule specify the lumen levels for the two LED fixtures types (E7- Canopy Lighting and F7- Sidewalk Lighting). Currently they are listed as "Absolute ", what does that mean? How many lumens are emitted for these fixtures? Please provide the above information on the plan. 4. [Comment] The Health Department (Bill Craun) has requested the applicant send updated engineering plans for their review. The site's P/R septic system needs to be approved by the Health Department prior to final site plan approval. Once approval is received please provide documentation for our records. Rev 1) Provide documentation of Health Department approval for our records. ARB - Margaret Maliszewski 1. Light levels under the canopy reach over 80 footcandles. Entrance Corridor guidelines state: "Light levels exceeding 30 footcandles are not appropriate for display lots in the Entrance Corridors. Lower light.levels will apply to most other uses in the Entrance Corridors." Please revise the photometric plan .to maintain light levels below 30 footcandles. 2. Detail D on sheet 7 is labeled as canopy lighting, but appears to be lighting for the freestanding sign. Please resolve. 3. Delete note #13 on Sheet 6. 4. Please add the following note to Sheet 6: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 5. Add two ornamental trees, one on either side of the curved wall at the west end of the site. 6. If possible, add low growing shrubs in the islands on both sides of the northern entrance into the site to compensate for the trees lost to sight distance requirements. VDOT— Joel DeNunzio No objections. Please note that any construction within the VDOT right of way will require a land use permit. Fire and Rescue- Robbie Gilmer No objections. E911— Andrew Slack No objections. Building Inspections — Jay Schlothauer No objections Note: Due to the proximity of the east building wall to the property line, that wall must be built with a 2 -hour fire - rating. Comments from the Engineering Department are provided on additional pages.. Please contact Christopher P. Perez at the Department of Community Development 296 -5832 ext. 3443 for further information. 2 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia .22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Review coordinator: Shadwell. Market McKee Carson Lloyd F. Wood, Jr. 3 April 2012 5 July 2012 23 April 2012 9 July 2012 Michael Koslow Chris Perez SDP200700155 [fax 434- 977 -1194] [fax unknown] The fourth final site plan and comps submittal (SDP200700155) submitted 5 July 2012 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. This review does not include a review of Erosion & Sediment Control or Stormwater Management. Please adequately address the following comments for final approval: Application Information 1) Due to a proposed greater than 10,000 sft of proposed land disturbance, this project will require an approved Erosion & Sediment Control (ESC) plan. This project will also require a Stormwater Management (SWM) plan as identified in the Water Protection Ordinance. The WPO application previously reviewed under WP02007 -00106 has been deemed withdrawn due to inactivity [17- 204.F]. Please submit a separate WPO plan set and $600 fee which covers ESC and SWIM for this project for review. The application for WPO plan review is available here:, <hq: / /www.albemarle.ora /upload /itnag-es /forms center /departments /Community Develo pment/ forms /En$ineeringLand WPO Forms/Plan Review - Application Stormwater Management -BMP Plan.pdf> (Revl) Comment remains. A courtesy review of WPO for this project as proposed in tlae plan set follows as a separate document. For these comments to be binding, please submit the application and fee identified above. 2) Please provide copies of applicable (Virginia Department of Health, Virginia Department of Environmental Quality) permits or applications if permits are pending for modifications to existing underground storage tanks and new 10,000 gallon tank as identified on sheet 03. (Revl) Comment remains. Existing Conditions Information 1) Please show all existing utility easements with deed book references, locations, and dimensions or confirm if none exist. Overhead electric and sanitary sewer lines appear in the project's parcel. Engineering Review Comments Page 2 of 5 (Revl) Please label the limits of overhead electric easement shown on sheet 02. 2) Please provide all required offsite easements for proposed work outside the parcel (wall and entrance construction). (Revl) Comment remains. ;) l:alear.se field verify exi:. flwCy'topos r•Eaph wid ttote.as, rnna:lr oir the plwis. 'Exiyiirag fola€ r alrh�- rrrrrsi lie f`r� lc1 ae ie�� -e €1 ��- ithiaa s rre cal raclarr -parr €3f' °�t€ l �zl� ait::sl. :4aiiiago Arucltrre; and al.). exi st.iaa.g .rete.ntion p€ jid €; €ar tmct''d by V1Y.'.YF do .n t appear in, sairvey ors sheet 0' . s evl) C ooliad7 %:.788 had been izd(,re. "sseet 4) Please submit draft tier III Groundwater Assessment for review with application and fee as a condition of approval for Critical Slopes Waiver identified in Planning Commission meeting minutes 3/11/2008. Application is available here: < http: / /www.albemarle.org/upload /images /fonns center /departments /Community Develo pment/fonns /applications /Site Development Plan Preliminga & Checklist pdf> (Revl) Review of Tier III Groundwater Assessment is independent of review of site developmentplans Please complete the application above and pay Tier III Groundwater Assessment review fee of $510 as identified on p.2 of application located at link above to initiate Tier III Groundwater Assessment review. Proposed Plan View Information l flea:'€;,14j a. t valoe €>rr. graapli c scaile yin sheets 02, 04, 05, 06, £an €1 €17.Appaarellt, €listtan€c of 40' and 80 are = 00' aar.rd SOOl (Renv) Comment has been atirir°ewi;e 11ea se c orrect gr•alilaic :scab° showl) oar sheet 03. l:)i1nelis €orled 'le €igffis €ierrr € ?rrst:eaa .e aa.. . erg srt sc zlc of I 10 ;1:raphic scaile itidic:attes 1 20'. (z env) Comment has been at da'.s. cd. 1 please l�.r- ovi.de proposed pose€1 r:elairi..i:r.iag wall .bottom an([ top eleval.ie ns, ( env.) Commera ha.v been aeklfrav °.fie 4) Please label existij.).g €{rairiage easement .i:f atrea€ y recorded aas part of aa.<;Oa. eD.t V ..D01, l)ig h -wary° 41,11 roveiTrerrt pro, ct. ( ev) (,emmiefir has been addressed. PI-ease label 1.oiiiidaries and dirare-rrsiorr:, lor proposed pet•rrianem i.itilik ezrs rrrczrl for Central Telephone Coin: any o:f•V'.irginia as idendfied. on sheet 03. Engineering Review Comments Page 3 of 5 t derv.) �Go mrdent has been addre$s�dedl 6) Please revise proposed 8' entrance radius as identified on sheet 03. Minimum entrance radius is 12.5'. (Revl) Please label entrance radius for western corner of US 250 entrance on sheet 03. Please label US 250 on sheets 03, 04, and 06. Please label VA Route 22 on sheets 02, 04, 05, and 05. 7) VDOT approval is required for this project as it affects public right of way. (Revl) Comment has been acknowledged. 8) Please identify VDOT designation or equivalent detail for all proposed curbing shown on sheet 03 or references to curb details shown on sheet 08. (Revl) Please relocate label "Q 108" on sheet 03 which appears to indicate a turn arrow. Please identify apparent CG -2 curb (or equivalent in a detail) for curb proposed north of parking spaces adjacent to VA Route 22. Please identify limits of curb or curb and gutter proposed with this project. 9) Please hibel llinits of'e.xisting pa emeiil Iiiiiit fi)r € n top right corner of heet 031 (Revl) Comment has been adldraysed, 10) Parkim -, space. shmiki be seiatar<atieA fr €?iai errtraiwes by at le a,t 18" to prevent (11muing ont €? efatraances, (R evl) Commden! has been arldims ° °sed .1 1.) Picase provide ad-qu to ttirii rr€ wid.'Wr (:urthcst southeast parkirr� pace sh €>wii, r:s.tt shed (13. AN proposed xa vehicle p<arkitrl; iii this space �,�,,ould b ( : -onipe fled to b ad< up past proposed "'Im -xance to exit park.illo l <at.. (Revl) ,;'.ommenf has ls€:en. ad rnvsed 12) Plc,ase prf: vzcic, laala€.1:° f6rall pr € >1ar:ah:,c or c,:,r:ttaag, trc, - tzat <> c,�rsttrr��; € a ° €azrz<t€,w: ;truetures <a:. shmA rr or). heet iii. L,abe[ sh(atrlcl con, sporad labels, lio% -vi r sari drabs age profiles on :sheet 11. ( epl) Comment t has been ad dre:t5ed, Plan Detail Information l) Pea, e pz ° <avi €l.e st or °r.r)water artatxagerric.rtt sheet or €rc °aiioza lba° proposed R airs. €.Y'rarderi 1 and Raira (_lsarderi 2 as shown cira sheet 09, Engineering Review Comments Page 4 of 5 (Revl) has been addre.vsed. 2) Please pr<nide a traffic ( geii.crati(: n aod. di,, tribuitioji summary f.br witicipated traffic per 1"FE 1­rip (3er)eratioii Fhaiidbook or equivalerit, "Fliis project ject appears to coiricidekkiitli L.aiid k..Yse 85,3: (Axive.j-deuce: mafkel �.Vitffi (Reipl) Comment leas been addresseel rovido Calculation, f.or pav- Yieat ffiiAj:i.e,,sers, sb.u�wl in Heavy' Dulty. P1 aw. P 11 - Co.ricrete flavirig arid. Aspimit'llavirig seetiollss1lowrl oll sileet 08 accoant for pro,jected In flit Pir fhis facility, ,Rev.!) Cominew has been addresseiL 4) Please note sidewalk concrete specification for strength of 3000 psi at 28 days or stronger on Monolithic Curb and Sidewalk detail shown on sheet 08. (Revl) Comment Remains –please add note to this detail, 5) Please provide details for proposed counterfort retaining wall identified on sheet 03. Please include details for any pipe crossing or going under proposed retaining wall. Existing or proposed retaining walls with height greater than 4' will require safety railing. (Revl) Please label units for note "...footing designed to resist 100 — earth pressure on detail 6154 on sheet S4. 6) Plea, e update Site Constraction flotesshoi'-In on skieet 01 to reflect ourrent A lbeivarle Coumy (3eiwral ("ori,,,tructiort Notes as iric luded iri Courity'Desigii Standards klamial, (Re3,1) �.^'&mmeivf has beew adelresse�L 7) Please update Sheet Index on sheet 01 to reflect names and sheet numbers for drawings submitted with this plan set. (Revl) Please update sheet numbers on Sheet index on sheet 01 to reflect sheet numbers S-1 & S2 instead of sheets 13 & 14 for plan clarity or renumber the sheets to match the index. Drainage Profiles .1) Please provide aVDOT de. ig atioi.i. or equivale.nt d-tail :fbr eacb. proposed. drairi,kge striiottire. (Revl) Comment has been addressed. PI ase clarify drai-nape clesigii inteTiL ()rt sheet 05. a yard itilel is propo.,sed to Engineering Review Comments Page 5 of 5 drain vhi ]ft €a:f'l].1:3PI- Pipe, .1:�.1.c:i���e�.��:r�; dxaa..iii a.,-�,e proffle €?r.a. sheep 11. shows 163.1. 3 lf:t of'1-:11.)13.1::> pipe. Please clar.i:f'- vi -hick. exi Ling (or proposed by others) str€ e tires arj.r.d pipes tart iaaClUded iri drairia=fie c1€;sion arid which .,,"trtadtir s acrid pipes are proposed with Ihis pr €ject, 3 3 .p1. "a3se .ideaa.liA, t1.a.i.a:l ncr s or strenglf.a ul.aass 1 :br proposed 1...1..t:).l:'E pipes, (Revz) Comment has been addNuved, Drainage Computations 11 1''1I,aa.se provide scotar owlet 1,.3roteelioaa c €3rzapw ati£3als. 1' lw'a,e provide ti'raar.raai ; strEa tta're and pipe £ r'xi.i:aa.laCle �< 13ia.t.at caa cta. tat'rf .als. (Rerj) Comment has been addressed. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow@albemarle.org to schedule an appointment. .... _< '` __... : T, i ..4Sc .., L;i nom, .•':i_4f�� ��OC Alpr_ � IRGIlnP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 * *courtesy review — please submit an application for Erosion & Sediment Control review for these comments to be binding ** Project: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Shadwell Market McKee Carson Lloyd F. Wood, Jr. 5 July 2012 9 July 2012 Michael Koslow WP02012000XX [fax 434 -977 -1194] [fax unknown] The first stormwater management plan and erosion and sediment control plan (WP02012000 0Q submitted 5 July 2012 has received Engineering Review and does not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: Stormwater Management Plan 1) Please propose a treatment for runoff proposed to drain to roadside ditch "SCC -1" as shown on sheet 04. Examples include water quality swale, bioretention area, and a filterra storm treatment system within an enclosed drainage inlet. 2) Please include TOC and outlet name or description for each sub - drainage area identified on sheet 04. Please confirm units for Intensity identified on "Flow Summary Table" on sheet 04. 3) Please include the most recent "General construction notes for Stormwater Management plans" from county Design Standards Manual. Engineering Review Comments Page 2 of 2 Erosion Control Plan 1) Please identify Limits of Disturbance. Note on sheet 04 stating "the limit of disturbance line is the same as the property line" does not consider off -site excavation and disturbance for the proposed retaining wall. 1) Please include the most recent "General construction notes for Erosion and Sediment Control plans" from county Design Standards Manual. 2) Please identify the land use for the parcels immediately adjacent to the project in the "Adjacent Areas" section of the Erosion & Sediment Control Narrative on sheet 11. 3) Please label soils types and soil type divides on sheet. as referenced from the "Soils" section of the Erosion & Sediment Control Narrative on sheet 11. 4) Please increase the width of sediment trap ST -1 or otherwise provide adequate dry storage and wet storage for the 0.33 Acres of drainage area proposed to drain to it. 5) Please propose a construction entrance location to access proposed disturbance located south of US 250. 6) Please include dust control for disturbed areas during construction with the erosion & sediment control plan. 7) Please include temporary seeding and permanent seeding for the proposed disturbance located south of US 250. 8) Please identify proposed contractor parking location or include a statement in the plans that this area will be within the proposed limits of disturbance. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow@albemarle.org to schedule an appointment. [17- 204.fJ An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). ,.i'"[. � . �.�. ....:..:h :...... ^,i °.... ..z�..... a:,...`!....