HomeMy WebLinkAboutWPO201100071 Review Comments Bond Estimate 2012-07-03PROJECT NAME: Restore'N Station FILE M WPO- 2011 -00071 DATE APPROVED: 29- Jun -12 Item Unit Amount Unit Cost Subtotal Filterra 4x6 each 5 $6,400.00 $32,000 Filterra 4x8 each 4 $6,900.00 $27,600 Filterra 6x6 each 0 $7,100.00 $0 Filterra 6x8 each 0 $9,500.00 $0 Filterra 6x10 each 0 $12,100.00 $0 Filterra 6x12 each 0 $14,200.00 $0 Filterra Installation per project 9 $14,900 EC -1 outlet protection each 1 $200.00 $200 48" concrete riser structure each 2 $1,000.00 $2,000 Barrel pipe linear foot 220.00 $25.00 $5,500 Contech Underground Det. each 1.00 $38,900.00 $38,900 Contech Gravel cubic yard 681 $17.00 $11,577 Contech Gravel Delivery load 69 $45.00 $3,105 Contech Installation 50% of materials 1.00 $26,791.00 $26,791 subtotal $162,5n project management $24,386 subtotal $186,959 10% Contingency $18,696 TOTAL $205,655 ROUNDED TOTAL $205,700 min total after reduction $41,140