Shadwell Market
McKee Carson
Lloyd F. Wood, Jr.
3 April 2012
5 July 2012
23 April 2012
9 July 2012
Michael Koslow
Review coordinator: Chris Perez
SDP200700155
[fax 434 - 977 -11941
[fax unknown]
The fourth final site plan and comps submittal (SDP200700155) submitted 5 July 2012 have
received Engineering Review and do not appear to meet Albemarle County minimum checklist
items for approval. This review does not include a review of Erosion & Sediment Control or
Stormwater Management. Please adequately address the following comments for final approval:
Application Information
1) Due to a proposed greater than 10,000 sft of proposed land disturbance, this
project will require an approved Erosion & Sediment Control (ESC) plan. This project
will also require a Stormwater Management (SWM) plan as identified in the Water
Protection Ordinance. The WPO application previously reviewed under WP02007 -00106
has been deemed withdrawn due to inactivity [17- 204.F]. Please submit a separate WPO
plan set and $600 fee which covers ESC and SWM for this project for review. The
application for WPO plan review is available here:
<http: // www.albemarle.org /upload/images /forms_ center /departments /Community_Develo
pment/forms/Engineering and WPO Forms/Plan Review -
—Application _Stormwater _Management- BMP_Plan.pdf>
(Rev]) Comment remains. A courtesy review of WPO for this project as proposed in the
plan set follows as a separate document. For these comments to be binding, please
submit the application and fee identified above.
2) Please provide copies of applicable (Virginia Department of Health, Virginia
Department of Environmental Quality) permits or applications if permits are pending for
modifications to existing underground storage tanks and new 10,000 gallon tank as
identified on sheet 03.
(Rev]) Comment remains.
Existing Conditions Information
1) Please show all existing utility easements with deed book references, locations,
and dimensions or confirm if none exist. Overhead electric and sanitary sewer lines
appear in the project's parcel.
Engineering Review Comments
Page 2 of 5
(Rev]) Please label the limits of overhead electric easement shown on sheet 02.
2) Please provide all required offsite easements for proposed work outside the parcel
(wall and entrance construction).
(Revl) Comment remains.
3) Please field verify existing topography and note as much on the plans. Existing
topography must be field reviewed within one calendar year of each submittal. Drainage
structures and an existing retention pond constructed by VDOT do not appear in survey on
sheet 02.
(Revl) Comment has been addressed.
4) Please submit draft tier III Groundwater Assessment for review with application
and fee as a condition of approval for Critical Slopes Waiver identified in Planning
Commission meeting minutes 3/11/2008. Application is available here:
<hLtp://www.albemarle.or.g/upload/ima,ges/forins center/departments/Community—Develo
pment/forms /applications /Site Development Plan Preliminary & Checklist.pdf>
(Rev]) Review of Tier III Groundwater Assessment is independent of review of site
development plans. Please complete the application above and pay Tier III
Groundwater Assessment review fee of $510 as identified on p.2 of application located
at link above to initiate Tier III Groundwater Assessment review.
Proposed Plan View Information
Please adjust values on graphic scale on sheets 02, 04, 05, 06, and 07. Apparent
distances of 40' and 80' are shown as 400' and 800'.
(Rev]) Comment has been addressed.
2) Please correct graphic scale shown on sheet 03. Dimensioned lengths
demonstrate apparent scale of 1" = 10'; graphic scale indicates 1" = 20'.
(Revl) Comment has been addressed.
3) Please provide proposed retaining wall bottom and top elevations.
(Rev]) Comment has been addressed.
4) Please label existing drainage easement if already recorded as part of adjacent
VDOT highway improvement project.
(Rev]) Comment has been addressed.
5) Please label boundaries and dimensions for proposed permanent utility easement
for Central Telephone Company of Virginia as identified on sheet 03.
Engineering Review Comments
Page 3 of 5
(Revl) Comment has been addressed.
6) Please revise proposed 8' entrance radius as identified on sheet 03. Minimum
entrance radius is 12.5'.
(Rev]) Please label entrance radius for western corner of US 250 entrance on sheet 03.
Please label US 250 on sheets 03, 04, and 06. Please label VA Route 22 on sheets 02, 04,
05, and 05.
7) VDOT approval is required for this project as it affects public right of way.
(Rev]) Comment has been acknowledged.
8) Please identify VDOT designation or equivalent detail for all proposed curbing
shown on sheet 03 or references to curb details shown on sheet 08.
(Rev]) Please relocate label "Q 108" on sheet 03 which appears to indicate a turn arrow.
Please identify apparent CG -2 curb (or equivalent in a detail) for curb proposed north of
parking spaces adjacent to VA Route 22. Please identify limits of curb or curb and gutter
proposed with this project.
9) Please label limits of existing pavement limit for entrance shown on top right
corner of sheet 03.
(Rev]) Comment has been addressed.
10) Parking spaces should be separated from entrances by at least 18' to prevent
queuing onto entrances.
(Rev]) Comment has been addressed.
11) Please provide adequate turnaround for furthest southeast parking space shown on
sheet 03. As proposed a vehicle parking in this space would be compelled to back up
past proposed entrance to exit parking lot.
(Revl) Comment has been addressed.
12) Please provide labels for all proposed or existing tied -into existing drainage
structures as shown on sheet 05. Labels should correspond with labels shown on
drainage profiles on sheet 11.
(Revl) Comment has been addressed.
Plan Detail Information
1) Please provide stormwater management sheet or location for proposed Rain
Garden 1 and Rain Garden 2 as shown on sheet 09.
Engineering Review Comments
Page 4 of 5
(Rev]) Comment has been addressed.
2) Please provide a traffic generation and distribution summary for anticipated traffic
per ITE Trip Generation Handbook or equivalent. This project appears to coincide with
Land Use 853: Convenience Market with Gasoline Pumps.
(Revl) Comment has been addressed.
3) Please provide calculations for pavement thicknesses shown in Heavy Duty
Concrete Paving and Asphalt Paving sections shown on sheet 08 which account for
projected traffic for this facility.
(Rev]) Comment has been addressed.
4) Please note sidewalk concrete specification for strength of 3000 psi at 28 days or
stronger on Monolithic Curb and Sidewalk detail shown on sheet 08.
(Rev]) Comment Remains —please add note to this detail.
5) Please provide details for proposed counterfort retaining wall identified on sheet
03. Please include details for any pipe crossing or going under proposed retaining wall.
Existing or proposed retaining walls with height greater than 4' will require safety
railing.
(Rev]) Please label units for note "...footing designed to resist 100 _ earth pressure"
on detail 61S4 on sheet S4.
6) Please update Site Construction notes shown on sheet 01 to reflect current
Albemarle County General Construction Notes as included in County Design Standards
Manual.
(Rev]) Comment has been addressed.
7) Please update Sheet Index on sheet 01 to reflect names and sheet numbers for
drawings submitted with this plan set.
(Rev]) Please update sheet numbers on Sheet index on sheet 01 to reflect sheet
numbers Sl & S2 instead of sheets 13 & 14 for plan clarity or renumber the sheets to
match the index.
Drainage Profiles
1) Please provide a VDOT designation or equivalent detail for each proposed
drainage structure.
(Rev]) Comment has been addressed.
2) Please clarify drainage design intent. On sheet 05, a yard inlet is proposed to
Engineering Review Comments
Page 5 of 5
drain via 65.17 lft of HDPE pipe. However, drainage profile on sheet 11 shows 163.13
lft of HDPE pipe. Please clarify which existing (or proposed by others) structures and
pipes are included in drainage design and which structures and pipes are proposed with
this project.
(Rev]) Comment has been addressed.
3) Please identify thickness or strength class for proposed HDPE pipes.
(Rev]) Comment has been addressed.
Drainage Computations
1) Please provide scour outlet protection computations.
(Rev]) Comment has been addressed.
2) Please provide drainage structure and pipe drainage capacity calculations.
(Rev]) Comment has been addressed.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow @albemarle.