Loading...
HomeMy WebLinkAboutSDP201200022 Review Comments Preliminary Site Plan 2012-07-24•e I-1 i�jj�.' Nv�do COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 July 25, 2012 Justin Shimp Shimp Engineering PO Box 1113 Troy, Virginia 22974 RE: SDP - 2012 -022 Albemarle Health and Rehab- Preliminary Site Plan Mr. Shimp: The Department of Community Development hereby grants administrative approval to the above referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on July 25, 2013. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plans. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be made directly to each department /division /agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: Planning Services approval to include: 1. Meet all the requirements in Chapter 18 Section 32 for final site plans, including landscape plans, and lighting plans. Engineering approval to include: 1. The plan must meet all engineering requirements of the Water Protection, Subdivision, and Zoning Ordinances in addition to all engineering standards detailed in the County's Design Manual. Please contact Max Greene at 296-5 83 2 if you have questions or require additional information. Albemarle County Service Authority approval to include: 1. Add .a fire hydrant along the access road between the Monticello Fire Station and the proposed Albemarle Health and Rehabilitation Center. 2. Relocate fire hydrant on North side of building so it is not behind a sidewalk. One option to accomplish this maybe to make a parking space into an island to locate the FHA in. 3. Show location of relocated domestic water meter for neighboring parcel. Please locate this meter on the south side of the building to assist in water quality in the dead end waterline until ACSA completes future loop to circulate water. 4. Final water and sewer plans are required for our review and approval prior to construction approval. Please contact Alex Morrison at (43,4) 977 - 4511 EXT: 116 if you have questions or require additional information. Fire & Rescue approval to include: 1. Hydrant spacing shall be 400 ft per travelway around the building. Please contact Robbie Gilmer at 296 -5833 if you have questions or require additional information. VDOT approval to include: 1. The pavement width transition from station 10 +00 to 12 +25 will need additional correction. Please provide a copy of the approved county road plan, SDP - 2001 -00089 with the next submittal of this preliminary site plan. It appears that the pavement section between these stations should be a three lane section. 2. Changes to the vertical curve at station 14 +47.86 to increase the stopping sight distance has caused the vertical curve at station 16 +19.58 to be below the minimum stopping sight distance of 200 feet. 3. The proposed curb ramps need to be adjusted to meet the minimum standards. This can be done with the final site plan. 4. The proposed sanitary sewer line need to cross the public road as close to perpendicular as possible. No longitudinal installations or manhole structures will be permitted within the public road pavement. Please contact Joel DeNunzio at 434 -589 -5871 if you have questions or require additional information. 2 Senior Planner Planning Services