HomeMy WebLinkAboutSDP201200036 Review Comments Preliminary Site Plan 2012-08-03COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 13, 2012 Craig Kotarski Timmons 919 2pd Street SE Charlottesville, VA 22911 RE: SDP - 2012 -036 Morey Creek Office Park- Preliminary Site Plan Mr. Kotarski The Department of Community Development hereby grants administrative approval to the above referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on August 13, 2013. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plans. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be.made directly to each department /division /agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: Planning Services approval to include: 1. Meet all the requirements in Chapter 18 Section 32 for final site plans, including landscape plans, and lighting plans. 2. Address all applicable proffers per ZMA2010 -003. Please contact Megan Yaniglos at 296 -5832 if you have questions or require additional information. Engineering approval to include: 1. The plan must meet all engineering requirements of the Water Protection, Subdivision, and Zoning Ordinances in addition to all engineering standards detailed in the County's Design Manual. 2. See attached additional comments. Please contact Michael Koslow at 296 -5832 if you have questions or require additional information. Albemarle County Service Authority approval to include: 1. Final water and sewer plans are required for our review and approval prior to construction approval. 2. ACSA is reviewing the data from the field testing. Any offsite work will need to be coordinated with ACSA during final site plan. Please contact Alex Morrison at (434) 977 - 4511 EXT: 116 if you have questions or require additional information. VDOT approval to include: 1. A construction plan will be required for road improvements and entrances to the public road with the final site plan. The final site plan will need to meet the VDOT minimum standards of the Road Design Manual. The following items will need to be addressed with the final site plan. a. Two way and one way entrances need to meet the minimum width and throat length criteria set in the VDOT Road Design Manual Appendix F. The entrances on the preliminary plan appear to be less than the minimum standards. b. The sidewalk and ditch section in between the two entrances will need to be revised so they are not overlapping. The site frontage should include curb and gutter in between the two entrances. c. The one way entrance approach needs to be treated as a curbed entrance in a rural road section with an adequate pavement offset and taper. d. The VDOT standard WP -2 will be required for pavement widening. e. Curb ramps are needed at the one way entrance. f. Drainage plan will be required. Please contact Joel DeNunzio at 434 -589 -5871 if you have questions or require additional information. Sincerely, egad Yaniglos Senior Planner Planning Services cyoc n� GIRGIN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Morey Creels Office Park - Preliminary SDP201200036 Plan preparer: Timmons Group [fax 434 - 295 -83171 Owner or rep.: UVA Physicians Group [tel 434- 980 -6132] Plan received date: 14 June 2012 (Rev1)16 July 2012 Date of comments: 3 July 2012 (Rev1) 26 July 2012 Reviewer: Michael Koslow Review coordinator: Megan Yaniglos The second preliminary site plan and comps submittal (SDP201200036) submitted 16 July 2012 has received Engineering Review and does appear to meet Albemarle County minimum checklist items for preliminary site plan approval. This review does not include a review of Erosion & Sediment Control or Stormwater Management. Please adequately address the following comments for final site plan approval: Existing Conditions Information 1.) Please shoe- al.1 existim, utility easements with deed book references, locations. anal. ditn.ensions or confirm if none ex:i.st. Overhead electric l rtes. water main and sanitary sewer lines appear in the project's parcel. (Rev]) C,'crmnient has been wldre ved. ?) Please identify the limits ofihe 100' stream buffer for Morey Creel;:. (Rev]) C'ommenf has been addressed. } . Please note date of original field topographic survey on sheet C0.0. :Hease :field verify existing topography. and note as much on the plans. Existing t :opograp}1y must: be field reviewed within one calendar year of each submittal. (Rev1) C'ommsent has been addressed 4) Please identify FEMA map number or basis for identification of existing 100 year flood plain delineation. (Rev1) Identified number 0268D is actually the FIRM's panel number. This is acceptable for preliminary site plan submittal. For final site plan approval please include the full map number: 51003CO268D. Proposed Plan View Information I) Vf:>(: T approva] is required for this project as it affects public right of' vva.y. (Revd) Comment has been rrcdcnowledgec. 2) Please identify VDOT designation or equivalent detail for all proposed curbing sho«11 on sheet C1.0 or references to curb details with details in plan set. (Revd) Comment has been addressed 3) Four parking spaces shown adjacent to building would present a traffic conflict. Please remove these spaces. The passenger drop off should be designed to accommodate a JAUNT loading space per proffer #3 of ZMA2010- 00003. (Rev]) Agreed —please provide a sign detail with final site plan approval. Comment has been addressed for preliminary plan approval, 4) Please include safety railing fen• proposed retaining walls greater than RAII- feet in herd?ht.. (Rev.I) Comment has been addressed. 5) Please including guardrail with VDT:) f designations for retaining walls next to t:ra.vel ways 11.8-32.7.21. (.Rev]) Comment has been addressed. 6) Please inehIde proposed easement: fbr side «alk. to be maintained with Fontaine Avemic (taut: outside of right of way). (Rev]) C"oap meaaf has been addressed 7) Please show existing and proposed (if applicable) topography for 500' sight distance line shown west of proposed entrance route intersection with Fontaine Avenue. An intersection sight distance easement may be required. (Rev1) Pending VDOT review, this configuration is acceptable for preliminary plan approval. 8) Please identify VD01' desionation for proposed entrance to Fontaine Avenue. (Revl) (,om aenf h€div been addressed, 9) Please label entrance radii. (Rev1) Please label entrance radii for Entrance to Level 2 parking garage with final site plan approval. Comment has been addressed for preliminary site plan approval. 10) flea.se revise turd pure widi'h. are required. (Revl) Comment has been daddres: eeL 11) Please identify inflow location to stormfrlter filtration system adjacent to loading spaces. It appears manholes but no inlets contribute to this system. (Rev.l) Comment has been addressed, 12) Please superelevate loading spaces and dumpster pad or otherwise ensure runoff does not run to proposed dumpster area [18- 4.12.19]. (Revl) Comment has been addressed for preliminary site plan approval. Please include spot elevations for final site plan approval. 13) Please label or designate all proposed drainage structures. (Revl) Comment has been adda- essedl 14) Please identify proposed pedestrian bridge abutment locations to ensure there are no proposed disturbances within the existing 100 year flood plain limits. (Rev]) Oynnaent hero been addressed) 15) Traffic signal and road improvements to Fontaine Avenue included with Proffers #4A, 4 Q, and 4C from ZMA2010 -00003 do not appear in this plan set. At this time, the County is requesting these improvements to be submitted either as part of this plan set or another plan set prior to final site plan approval (not required for preliminary approval). (Revl) Per prior correspondence, approval for preliminary site plan is contingent on submittal of VDOT traffic signal warrant analysis. Confirmation of signal warrant analysis submittal was received on July 26, 2012. Comment has been addressed for preliminary plan approval. Proposed road and traffic signal improvements associated with this project will require bonding for final site plan approval. Plan Detail Information 1) Plea,,se provide a typical seetiori for the Proposed entrance road. (Re),l) +C:'omrnertt has been acknowledged 2) Please provide; a pavement section Ior the proposed entrance road.. (Revl) Comment has been aclaiowkdged. 3) Please provide atypical sectiori for the proposed 1'oritainc; Averme widening. (Rev.1) Conzrnent has been aclmowledgee 4) .Please provide a.'pavenient section for die proposed. Foo:tain.e Avenue Wideniri <.;. (Rev.1) Comment has been aclinowledged 5) Please provide a pavement section for the proposed dimipster pact. (Rev.1) Comment has been acknowledged. 6) Please provide a paverri.ent section :for the proposed concrete sidewalk.. (Revl) Comment hers been aeAnowkdge(t 7) Please provide a detail for the proposed retaining -wall including railing or guardrail in sect:iori (see also above 'wall comments). (Rev.1) ("onwient has been ackmnvledged 8) F'.lease provide details For any pipes or drainage structures tlir« iigli or raider walls. (Revl) Comment has been crcicnore�leelgee� 9) Please 'provide a detail For the 'proposed pedestrian bridge including proposed abutments. (Rev.1) Comment has been acknowledge(l 10) :please irr.clude Albemarle County General Construction. Notes. (Rerl) Commew has been acknowledged Drainage Profiles 1 } Fleas: provide dr<linrr.ge profiles. (Revl) Comment has been acknowledged. Drainage Computations l.) :Please provi.de drairlag;e corrrlxrtations. (,Rev.1) Comment has been acknowledged. Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow cr,albemarle.org to schedule an appointment.