COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewer:
Review coordinator:
Morey Creek Office Park - Preliminary SDP201200036
Timmons Group
UVA Physicians Group
14 June 2012
(Rev]) 16 July 2012
3 July 2012
(Rev]) 26 July 2012
Michael Koslow
Megan Yaniglos
[fax 434 - 295 -83171
[tel 434- 980 -6132]
The second preliminary site plan and comps submittal (SDP201200036) submitted 16 July 2012
has received Engineering Review and does appear to meet Albemarle County minimum checklist
items for preliminary site plan approval. This review does not include a review of Erosion &
Sediment Control or Stormwater Management. Please adequately address the following comments
for final site plan approval:
Existing Conditions Information
1) rica�,c show all existing utility easements with deed book references, locations,
and dimensions or confirm if none exist. Overhead electric lines, water main and sanitary
sewer lines appear in the project's parcel.
(Rev]) Comment has been addressed.
2) Please identify the limits of the 100' stream buffer for Morey Creek.
(Rev-1) Comment has been addressed.
3) Please note date of original field topographic survey on sheet C0.0. Please field
verify existing topography and note as much on the plans. Existing topography must be
field reviewed within one calendar year of each submittal.
(Rev-1) Comment has been addressed.
4) Please identify FEMA map number or basis for identification of existing 100 year
flood plain delineation.
(Rev1) Identified number 0268D is actually the FIRM'S panel number. This is
acceptable for preliminary site plan submittal. For final site plan approval please
include the full map number. 51003CO268D.
Proposed Plan View Information
VDOT approval is required for this project as it affects public right of way.
(Rev]) Comment has been acknowledged.
Engineering Review Comments
Page 2 of 4
2) Please identify VDOT designation or equivalent detail for all proposed curbing
shown on sheet C1.0 or references to curb details with details in plan set.
(Revl) Comment has been addressed.
3) Four parking spaces shown adjacent to building would present a traffic conflict.
Please remove these spaces. The passenger drop off should be designed to
accommodate a JAUNT loading space per proffer #3 of ZMA2010- 00003.
(Rev]) Agreed —please provide a sign detail with final site plan approval. Comment has
been addressed for preliminary plan approval.
4) Please include safety railing for proposed retaining walls greater than four feet in
height.
(Revl) Comment has been addressed.
5) Please including guardrail with VDOT designations for retaining walls next to
travel ways [18- 32.7.2].
(Rev]) Comment has been addressed.
6) Please include proposed easement for sidewalk to be maintained with Fontaine
Avenue (but outside of right of way).
(Revl) Comment has been addressed.
7) Please show existing and proposed (if applicable) topography for 500' sight
distance line shown west of proposed entrance route intersection with Fontaine Avenue.
An intersection sight distance easement may be required.
(Rev]) Pending VDOT review, this configuration is acceptable for preliminary plan
approval.
8) Please identify VDOT designation for proposed entrance to Fontaine Avenue.
(Rev]) Comment has been addressed.
9) Please label entrance radii.
(Rev]) Please label entrance radii for Entrance to Level 2 parking garage with final site
plan approval. Comment has been addressed for preliminary site plan approval.
10) Please revise turn lane width. Turn lane width of 12' and taper rate of 12:1 are
required.
(Revl) Comment has been addressed.
11) Please identify inflow location to stormfilter filtration system adjacent to loading
spaces. It appears manholes but no inlets contribute to this system.
(Rev]) Comment has been addressed.
12) Please superelevate loading spaces and dumpster pad or otherwise ensure runoff
does not run to proposed dumpster area [18- 4.12.19].
(Rev]) Comment has been addressed for preliminary site plan approval. Please include
spot elevations for final site plan approval.
13) Please label or designate all proposed drainage structures.
(Revl) Comment has been addressed.
Engineering Review Comments
Page 3 of 4
14) Please identify proposed pedestrian bridge abutment locations to ensure there are
no proposed disturbances within the existing 100 year flood plain limits.
(Rev]) Comment has been addressed.
15) Traffic signal and road improvements to Fontaine Avenue included with Proffers
#4A, 4B, and 4C from ZMA2010 -00003 do not appear in this plan set. At this time, the
County is requesting these improvements to be submitted either as part of this plan set
or another plan set prior to final site plan approval (not required for preliminary
approval).
(Rev-1) Per prior correspondence, approval for preliminary site plan is contingent on
submittal of VDOT traffic signal warrant analysis. Confirmation of signal warrant
analysis submittal was received on July 26, 2012. Comment has been addressed for
preliminary plan approval. Proposed road and traffic signal improvements associated
with this project will require bonding for final site plan approval.
Plan Detail Information
lease provide a typical section for the proposed entrance road.
(Rev-1) Comment has been acknowledged.
2) Please provide a pavement section for the proposed entrance road.
(Rev]) Comment has been acknowledged.
3) Please provide a typical section for the proposed Fontaine Avenue widening.
(Rev]) Comment has been acknowledged.
4) Please provide a pavement section for the proposed Fontaine Avenue widening.
(Rev]) Comment has been acknowledged.
5) Please provide a pavement section for the proposed dumpster pad.
(Rev]) Comment has been acknowledged.
6) Please provide a pavement section for the proposed concrete sidewalk.
(Rev]) Comment has been acknowledged.
7) Please provide a detail for the proposed retaining wall including railing or
guardrail in section (see also above wall comments).
(Rev]) Comment has been acknowledged.
8) Please provide details for any pipes or drainage structures through or under walls.
(Rev-1) Comment has been acknowledged.
9) Please provide a detail for the proposed pedestrian bridge including proposed
abutments.
(Revl) Comment has been acknowledged.
Engineering Review Comments
Page 4 of 4
10) Please include Albemarle County General Construction Notes.
(Rev]) Comment has been acknowledged.
Drainage Profiles
1) Please provide drainage profiles.
(Revl) Comment has been acknowledged.
Drainage Computations
Please provide drainage computations.
(Rev]) Comment has been acknowledged.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow @albemarle.org
to schedule an appointment.