HomeMy WebLinkAboutSUB201200038 Review Comments Preliminary Plat 2012-08-15Project:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewer:
Review coordinator:
*-&A
County of Albemarle
Department of Community Development
Memorandum
Westlake Hills Subdivision
Collins Engineering
Lickinghole Creek, LLC
29 March 2012
Rev]: I August 2012
16 April 2012
Rev]: XX August 2012
Michael Koslow
Ellie Ray
SUB201200038
[fax 434 - 245 -0300]
[fax unknown]
The 2"d submittal of the preliminary subdivision plat has been reviewed.
1. Before final plat approval, engineering will need to approve detailed plans, computations, and
necessary supporting documents for all physical improvements including, but not limited to,
a. road plans
b. drainage plans and computations,
c. erosion and sediment control plan
d. stormwater management plans and computations (A.C. 14 -311).
(Rev]) Comment has been addressed for preliminary plat.
2. Please include all current easements for this property (A.C. 14- 302.5) including the existing
easement for the bonded stormwater management facility for West Hall Phase 5 (DB 4024 PG
489 -501). An adequately sized culvert will be required for conveyance of runoff from West Hall
Phase 5 under proposed Road "A" Connector Road. This facility will need to consider previously
agreed -to runoff from West Hall Phase 5 as contributing waters for treatment and storage (if
applicable) purposes.
(Revl) Comment has been addressed.
3. All physical improvements for access and utilities will need to be constructed and approved or
bonded prior to final plat approval. (A.C. 14 -434 and 435).
(Rev]) Comment has been addressed for preliminary plat.
4. Please revise boundary distances as shown on sheet 2 to match scaled values.
(Rev]) Comment has been addressed.
5. I have an email request in to Jack Kelsey to compare the proposed typical section for Eastern
Avenue with the section planned by the Office of Facilities Development. I will forward his
response.
(Rev]) Comment has been addressed for preliminary plat.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow @albemarle.
to schedule an appointment.
C:\ inetpub \wwwroot \cityviewlazerfiche _integration \tempdocholder \4
4077.doc