Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201200069 Review Comments Bond Estimate 2012-08-28
8/28/2012 BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: Shadwell Market W P02012 -00069 08/28/12 MAK plans dated 8/6/2012 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1 1500 1500 SILT FENCE LF 400 5 2000 DIVERSION DIKE LF 150 3 450 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0.3 1000 300 INLET PROTECTION EA 2 200 400 CHECK DAMS SQ.YD. 12 30 360 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 subtotal project management subtotal CONTINGENCY TOTAL BOND AMOUNT REQUIRED 9010.00 1351.50 10361.50 LS 10% 1036.15 11397.65 11400.00 last revised: 12-5-01 C:\ Users \mkoslow \Documents \Current Reviews \WP0201200069 Shadwell Market \2012 -08 -28 escp bond estimate wpo2012- 00069.x1s