Ellie,
RWSA has no additional comments. Please ensure the applicant received our comments from 4/19 and notify us when
site plans are available.
Thanks a lot,
Victoria
From: Ellie Ray [mailto:eray(a)albemarle.org]
Sent: Wednesday, August 01, 2012 10:06 AM
To: Victoria Fort
Cc: Jeremy Lynn
Subject: RE: SUB201200038
Victoria,
I wanted to let you know that revisions to this application have been submitted. I am forwarding a copy to ACSA today,
but do not have an extra copy to forward to you (the applicant only submitted 8 and there were a lot of reviewers who
had comments). I just wanted to give you the heads up so you would know that ACSA should have a copy in the next
day or two. My comments on the revisions are due in two weeks and it's always helpful to try to give a comprehensive
set of comments at that time... however, I know that isn't always possible.
Please let me know if you need anything from me.
Thanks,
Ellie Carter Ray, PLA
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Victoria Fort [mailto:vfort(cbrivanna.orq]
Sent: Thursday, April 19, 2012 11:23 AM
To: Ellie Ray
Cc: Jeremy Lynn
Subject: SUB201200038
Ellie,
I apologize for the delay in sending comments — we copy site plans from the ACSA, so there's always a bit of a delay in
getting a copy for review. RWSA has reviewed the preliminary subdivision plat for Westlake Hills as prepared by Collins
Engineering and dated 3/26/2012 and has the following comments:
1. Due to the size of the proposed development, RWSA will need to approve sewage flows to determine that
adequate capacity is available when the development goes online. This request may be submitted during site
plan review.
2. The RWSA 15" sewer along the southern boundary of the development is slated for upgrade in the next 15 -20
years. RWSA would like to request an additional 20' of easement extending from the northern boundary of the
existing 30' easement.
3. As development of this parcel may inhibit access to the existing RWSA easement, RWSA would like to discuss
the possibility of obtaining one or more access easements through the development.
4. As there appear to be several potential impacts to existing RWSA sewer lines within the project area (most
notably the connection to RWSA CZI -MH -137 and the locations and extents of SWM ponds and storm water
outfalls), RWSA will need to review site plans once they are available.
Please let me know if you have any questions.