Service Authority
TO: Megan Yaniglos
FROM: Alexander J. Morrison, EIT, Civil Engineer
DATE: August 22, 2012
RE: Site Plan Technical Review for: SDP201200046: Cascadia Blocks 4 -7 Preliminary
SUB201200091: Cascadia Blocks 4 -7 Preliminary
TMP# 65 -25, 78 -59A, 78 -59 and 78E -H1
The below checked items apply to
this site.
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓
A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓
2.
A 12 inch water line is located on site.
3.
Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓
4.
An 8 inch sewer line is located approximately 10'distance from the site.
5.
An Industrial Waste Ordinance survey form must be completed.
✓
6.
No improvements or obstructions shall be placed within existing or future
easements.
7.
and plans are currently under review.
8.
and plans have been received and approved.
9.
No plans are required.
✓
10.
Final water and sewer plans required for review prior to granting construction
approval.
11.
Final site plan may /may not be signed.
✓
12.
RWSA approval for water and /or sewer connections.
13.
City of Charlottesville approval for sewer.
✓
Comments:
• The ACSA has reviewed the sewer capacity downstream of the proposed development.
From our preliminary review it appears that the proposed blocks 4 -7 should not have any
downstream sewer capacity issues. It is recommended that the developer setup a meeting
with ACSA staff (Alexander Morrison and Tom Garrison) to discuss capacity issues for
future development.
• RWSA capacity certification for wastewater flows will be required during construction
review for the proposed blocks 4 -7.
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698
www.serviceauthoriy.org
pj1J �]J'] �1 � J �) filly
Service Authtrity
2 r,♦'. i l
SUBDIVISION PLAT DISCLAIMER
The Albemarle County Service Authority (ACSA) has no technical
comments on the SUB being reviewed. Engineering comments are usually
reserved for the site plan review stage. Subdivision plats should correctly
show ownership of properties and existing easements. Recordation of new
easements should occur before dedication to and acceptance by the ACSA.
The ACSA can review the proposed subdivision plat and determine if it
is included in the jurisdictional area for water and /or sewer service.
Water and /or sewer connections to the ACSA system are allotted on a first
come, first served basis at the time connection fees are paid. The ACSA
does not reserve capacity in its system for a specific project.