Loading...
HomeMy WebLinkAboutSDP201200037 Review Comments Minor Amendment 2012-09-07Christopher Perez From: Philip Custer Sent: Friday, September 07, 2012 2:32 PM To: rumberger @wwassociates.net; hwhite @wwassociates.net; Tom Gallagher Cc: Christopher Perez; Glenn Brooks Subject: FW: District Avenue Extended Please see the email below for VDOT comments. From: DeNunzio, Joel D., P.E. (VDOT) [ mailto:J oel.DeNunzio@VDOT.virginia.gov] Sent: Friday, September 07, 2012 2:30 PM To: Philip Custer Subject: District Avenue Extended Phil, I reviewed the plan for District Avenue Extended and have the following comments: 1. The layout of the lane configuration is acceptable. 2. The vertical change at station 41 +00 has a vertical break without a vertical curve. This should be revised to extend the cross slope of the road with an adequate sag vertical curve. Please let me know if you have any questions. Thanks Joel Joel DeNunzio, P.E. Acting Residency Administrator VDOT Charlottesville Residency 434 - 422 -9373 joel.denunzio@vdot.virginia.gov