HomeMy WebLinkAboutSUB201200111 Review Comments Road Plan and Comps. 2012-11-12`J I1 pJ11 �11'] �J, r, �) ifilly
Service Authority
TO: Michael Koslow
FROM: Alexander J. Morrison, Civil Engineer
DATE: November 12, 2012
RE: Site Plan Technical Review for: SUB201200111: Morey Creek Off -Site Road
Improvement Plans
The below checked items apply to this site.
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓
A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓
2.
A 10 inch water line is located approximately (within off -site area) distant.
3.
Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓
4.
A 24 inch sewer line is located approximately (within off -site area) distant.
5.
An Industrial Waste Ordinance survey form must be completed.
✓
6.
No improvements or obstructions shall be placed within existing or future
easements.
7.
and plans are currently under review.
8.
and plans have been received and approved.
9.
No plans are required.
✓
10.
Final water and sewer plans are required for our review and approval prior to
granting construction approval.
11.
Final site plan may /may not be signed.
12.
RWSA approval for water and /or sewer connections.
13.
City of Charlottesville approval for sewer.
✓
Comments:
• Show proposed Buckingham Circle waterline (currently under construction).
• Show proposed new waterline and connection with Buckingham Circle.
• Sheet 3 shows a "proposed sewer line easement" with deed book and page numbers.
There is an existing sewer line here. Please update accordingly.
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698
www.serviceauthority.org
Pj1J �]J'] �1 � J �) filly
Service Authority
sn*q ♦ Cng
The Albemarle County Service Authority (ACSA) has no technical
comments on the SUB being reviewed. Engineering comments are usually
reserved for the site plan review stage. Subdivision plats should correctly
show ownership of properties and existing easements. Recordation of new
easements should occur before dedication to and acceptance by the ACSA.
The ACSA can review the proposed subdivision plat and determine if it
is included in the jurisdictional area for water and /or sewer service.
Water and /or sewer connections to the ACSA system are allotted on a first
come, first served basis at the time connection fees are paid. The ACSA
does not reserve capacity in its system for a specific project.
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698
www.serviceauthority.org