HomeMy WebLinkAboutWPO201200081 Review Comments Erosion Control Plan 2012-09-27Max, the only comments I have for the E &S review are:
1. Expand the limits of construction to include all work, including demo,
staging, and construction.
2. Repair or pipe the riprap ditch going to the pond.