Loading...
HomeMy WebLinkAboutWPO201200081 Review Comments Stormwater Management Plan 2012-10-18i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Lanetown Subdivision WP0201200081, SUB201200112 Plan preparer: Dominion Engineering [fax 979 -16811 Owner or rep.: Emile Bethanne Patterson [fax Unknown] Plan received date: 24 September 2012 Date of comments: 18 October 2012 Reviewer: Max Greene, Mark Hopkins (E &SC) The Water Protection Plans (WP0201200081) submitted 17 September 2012 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: A) Road and drainage plans (SUB201200112) 1) VDOT approval is required. Comments will be forwarded when received. [DM905] B) Stormwater Management and Mitigation Plan (WP0201200081) 1) There are no objections to the proposed SWM design at this time. Due to requested changes from other departments, additional comments and or conditions may be forth coming. C) Erosion Control Plan (WP0201200081) The following comments are from Mr. Mark Hopkins. (Ext. 3380) 1) Expand the limits of construction to include all work, including demo, staging, and construction. 2) Repair or pipe the riprap ditch going to the pond. Once these comments have been addressed, please submit 2 copies (add 1 more copy if VDOT needs to review, and 1 more if mass - grading that Planning needs to review) of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mcreene @albemarle.orc to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: CDDEl_swm,rp_MRG_Lanetown Sub - pp.doc