Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201200059 Review Comments Bond Estimate 2012-10-09
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Charlottesville High School Stadium Improvements PROJECT NUMBER: WPO201200059 DATE OF ESTIMATE: 10/09/12 ESTIMATE BY: MRG BASED ON: Approved Plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.09 1500 1635 SILT FENCE LF 660 5 3300 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0.48 1000 480 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 4 200 800 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 8215.00 project management 1232.25 subtotal 9447.25 CONTINGENCY LS 10% 944.73 TOTAL 10391.98 BOND AMOUNT REQUIRED 10400.00