COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Erosion and Sediment Control and Stormwater Management Plan for
Foothill Crossing Phase II & Phase III Road Plans WP0201200047
Plan preparer:
Collins Engineering
Owner or rep.:
Foothills Crossing Inc.
Plan received date:
20 August 2012
Date of comments:
9 October 2012
Reviewer:
Michael Koslow
The Erosion & Sediment Control Plans and Stormwater Management Plan (WP0201200047)
submitted 20 August 2012 has received Engineering Review and meets Albemarle County
minimum checklist items for engineering approval.
The forms and instructions to request the Water Protection Ordinance Bond amount can be found
on the Community Development Department Web site at
http: / /www. albemarle.org/upload/images/ forms_ center / departments /CommunityDevelopment/f
orms/ bonds /Bond_ EstimateRequestForm.pdf
The forms and instructions to post the Water Protection Ordinance Bond can be found on the
Community Development Department Web site on
hqp://www.albemarle.oriz/deptforms.asp?department=bonds
The instructions to prepare the Stormwater Management/BMP Facilities Maintenance Agreement
can be found on the Community Development Department Web site on:
< httD:// www.albemarle.or2 /UDload/imaLes /forms center /departments /Community Development/
forms/Engineering—and WPOForms/PlanReview-
_Stormwater Management BMP Facilities Maintenance _ Agreement_ Procedures.pdf>
You may contact Ana Kilmer (Albemarle County Department of Community Development) at
ext. 3246 for further information on bonding procedures and Maintenance Agreements.
Once the E &SC bond has been posted, you may contact the Department of Community
Development to arrange a pre - construction meeting with a County Erosion & Sediment Control
Inspector. Should the County Inspector find the limits of disturbance increased or the need for
additional control measures required to protect the site, additional fees will be required.
[17- 204.G] An approved erosion and sediment control plan shall be void if the owner fails to obtain a grading,
building, or other permit for activities involving land disturbing activities within one (1) year after the date of the
approval.
File: C:\ inetpub \wwwroot \cityviewlazerfiche_ integration \tempdocholder \44972.doc