HomeMy WebLinkAboutWPO201200088 Review Comments Erosion Control Plan 2012-11-146bw
r.�
k7;
��RGIN�P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 229024596
Phone (434) 296 -3458 Fax (434) 9724126
Project: Farmington Country Club, # 17 Tee Renovation
Plan preparer: Scott Kinnan, CGCS [434- 245 -5370]
Owner or rep.: Farmington Country Club
Plan received date: 11/2/2012
Date of comments: 13 Nov 2012
Reviewer: Roberge, Michelle
A. Erosion Control Plan (WP0201200088)
Thank you for submitting your Sediment & Erosion Control Plan. I have provided a list of comments that
will help expedite your Water Protection Ordinance Planning Application approval. I included a quick
sketch of my recommendations. If you follow the recommendations your plan will meet the state minimum
standards and I can grant you approval. If you would like to do something different, submit a new plan
with the required state minimum standards. You are more than welcome to make an appointment on
Thursday, November 15, 2012 from 2pm to 4pm if you have additional questions or feel free to call me at
434 - 296 -3458.
1. Locate the property line.
2. Show a construction entrance, STD & SPEC 3.02
3. Include the general sediment and erosion control notes from the Albemarle County Design Standards
Manual 02 -12 -2010.
4. Phasing does not work with the proposed grading. I suggest fencing off the entire site and complete
grading in one phase.
5. Provide notes on Dust Control, Temporary Seeding, and Permanent Seeding to stabilize site
immediately and prevent further erosion.
6. Show spot elevations in between tees to clarify the drainage shown in the detail section.
7. 1 recommend providing a diversion dike to a sediment trap near the lowest tee.
8. If you would like to complete the project in two phases, provide a revised grading plan. The silt fence
you have proposed running across the site will suffice.
Sincerely,
Michelle Ro erge
County Engineer
434 - 296 -3458
General construction notes for Erosion and Sediment Control plans
1. The plan approving authority must be notified one week prior to the pre- construction
conference, one week prior to the commencement of land disturbing activity, and one week
prior to the final inspection.
2. All erosion and sediment control measures will be constructed and maintained according to
minimum standards and specifications of the Virginia Erosion and Sediment Control
Handbook and Virginia Regulations VR 625 -02 -00 Erosion and Sediment Control
Regulations.
3. All erosion and sediment control measures are to be placed prior to or as the first step in
clearing.
4. A copy of the approved erosion and sediment control plan shall be maintained on the site at
all times.
5. Prior to commencing land disturbing activities in areas other than indicated on these plans
(including, but not limited to, off -site borrow or waste areas), the contractor shall submit a
supplementary erosion control plan to the owner for review and approval by the plan
approving authority.
6. The contractor is responsible for installation of any additional erosion control measures
necessary to prevent erosion and sedimentation as determined by the plan approving
authority.
7. All disturbed areas are to drain to approved sediment control measures at all times during
land disturbing activities and during site development until final stabilization is achieved.
8. During dewatering operations, water will be pumped into an approved filtering device.
9. The contractor shall inspect all erosion control measures periodically and after each runoff producing
rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of
the e10. All fill material to be taken from an approved, designated borrow area.
11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert
materials only, free of roots, stumps, wood, rubbish, and other debris.
12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning
Ordinance section 5.1.28.
13. All inert materials shall be transported in compliance with section 13 -301 of the Code of
Albemarle.
14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to
the hours of 7:OOam to 9:OOpm.
15. Borrow, fill or waste activity shall be conducted in a safe manner than maintains lateral
support, or order to minimize any hazard to persons, physical damage to adjacent land and
improvements, and damage to any public street because o slides, sinking, or collapse.
16. The developer shall reserve the right to install, maintain, remove or convert to permanent
stormwater management facilities where applicable all erosion control measures required
by this plan regardless of the sale of any lot, unit, building or other portion of the property.
17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75
Ibs /acre, and in the months of September to February to consist a 50/50 mix of Annual
Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May
through August to consist of German Millet. Straw mulch is to be applied at 80lbs /100sf.
Alternatives are subject to approved by the County erosion control inspector.
18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch.
Agricultural grade limestone shall be applied at 90lbs /1000sf, incorporated into the top 4 -6
inches of soil. Fertilizer shall be applied at 1000lbs /acre and consist of a 10 -20 -10 nutrient
mix. Permanent seeding shall be applied at 180lbs /acre and consist of 95% Kentucky 31 or
Tall Fescue and 0 -5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be
applied at 80lbs /100sf. Alternatives are subject to approved by the County erosion control
inspector. rosion control devices shall be made immediately.
19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage
or clogging to structural measures is to be repair immediately. Silt traps are to be cleaned
when 50% of the wet storage volume is filled with sediment. All seeded areas are to be
reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes
which are collecting sediment to half their height must be cleaned and repaired
immediately.
20. All temporary erosion and sediment control measures are to be removed within 30 days of
final site stabilization, when measures are no longer needed, subject to approval by the
County erosion control inspector.
21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of
approval. (Water Protection Ordinance section 17- 204G.)
22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after
the datethe land disturbing activity commenced. (Water Protection Ordinance section 17-
2076)
1992 3.13
TEMPORARY SEDIMENT TRAP
1' VARIABLE
ORIGINAL VARIABLE*
GROUND
ELEV.
67 CU. YD. /ACRE �, +
VARIABLE
I, �
67 CU. YD. /ACRE
(EXCAVATED)
l FILTER CLOTH ORIGINAL
1 GROUND
ELEV.
*SEE PLATE 3.13 -1 COARSE AGGREGATE CLASS I RIPRAP
CROSS SECTION OF OUTLET
CLASS I RIPRAP
COARSE AGGREGATE
EXCAVATED FILTER CLOTH
AREA
..COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5
OUTLET (PERSPECTIVE VIEW)
Source: Va. DSWC
111-76
Plate 3.13 -2
1992
MINIMUM TOP YID TH (W)
REQUIRED FOR SEDIMENT
TRAP EMBANKMENTS
AC'C'ORDING TO HEIGHT OF
EMBANKMENT (FEE T)
iW!
H HO W
------- ---- -- 1.5 0.5 2.0
2.0 1.0 2.0
2.5 1.5 2.5
3.0 2.0 2.5
N 3.5 2.5 3.0
H o H 4.0 3.0 3.0
4.5 3.5 4.0
5.0 4.0 4.5
EXCAVATED AREA
MAX. DEPTH = 4'
ORIGINAL
GROUND
ELEV.
3.13
Source: Va. DSWC Plate 3.13 -1
3. The earthen embankment shall be seeded with temporary or permanent vegetation
(see Std. & Spec.'s 3.31 and 3.32) immediately after installation.
4. Construction operations shall be carried out in such a manner that erosion and water
pollution are minimized.
5. The structure shall be removed and the area stabilized when the upslope drainage
area has been stabilized.
6. All cut and fill slopes shall be 2:1 or flatter (except for excavated, wet storage area
which may be at a maximum 1:1. grade).
111-74
,-TOLE 17 TEE CONSTRUCTION PLAN N
FARMINGTON COUNTRY CLUB w O
to et %IE
0
CAR PATH.
! P%%&*s GR DE OUT AND RL'.1(IVE EXISTING. GULF E '•..1_4iC ly
ND SI OPFS SmoOl I I1' INTO ADIAC.E NT GRADES.
1 �
BUILD A CHAh1P10NSFIIPTEE. PROPOSED I , -
TEE 24 FT. DY 36 FT
PtA44 Cc, v+,;
INSTALL SILT FENCE WI FH
WIRE SUPPORT rvioy O
RFI OCATF GOI F- CAR PATH.
s /,/ / �n sir Nip )
LLJ
/�! F Act O
166 •Y �' .SSA ��'
l N/ »? �6g,. 5... _. -5s, INI'KE SLF L SALT FENCE WITH 'i°�.
S 6 iSq
s
. ,G \ ,
582 - I i, .560 513 ' `_
'k
,84 - / � I � SG �. '..
+ ` . � \+ -` I♦ I.�,�, til C7•E I.5 %u SLOPF ♦ _ �.* ' -• .— �- / ��
T. EL 584.5 / T. EL. 580.5 T. EL. 576.5 - -- T. EL 572.5 . PRfJPOSEU'OREINTATION OF FORWARDTEES F E
\`.
T. EL 558.4 t J
\ T. EL 562 5 �r1 •l PROPOSED CENTERLINE OF CALF ,HOLE
LE'♦TERLINE (7 7,;, HOIF
SLOPE si.ort 1.5% SLOPE
. ` '. , 1. "' .- _ �!' `- -_- ..` ...• PROPOSED FEES 24 FT. BY 36 FL P P o TEE AS TWO TEES.
•�` .. � -
IMTTSOF DI.
Tl1RBANCE' `•� ��� �♦ ...._..I �- -
REBUILD AND RESHAPE TEE. PROPOSED - � �' � ♦ -. �\
_O
TEE 24 FT. BY 70 FT. `
REBUILD AND RESHAPETEEAT EXISTING ELEVATION. \
U
PROPOSED TEE 24 FT. BY iU FT:
REBl1F1_D AND RESHAPE TEE. PROPOSED �
TEE 24 FT. BY 58 FT.
7