Loading...
HomeMy WebLinkAboutSUB200800287 Review Comments Preliminary Plat 2012-08-03pY AL13�,`Lr County of Albemarle Department of Community Development Memorandum To: Megan Yaniglos, Senior Planner From: Amelia McCulley, Zoning Administrator Date: July 30, 2012 Subject: SUB 2008 -287 Fontana Phase 4 C Preliminary Plat Thank you for giving me the opportunity to review this plat. I have several comments and suggestions. The notes on the plat will help inform buyers and will help us administer and enforce the proffers. 1. As you are aware, the developer is currently disputing the pedestrian paths and does not wish to complete them. ZMA 2011 -001 Fontana Phase 4C states "...These paths shall be completed to the satisfaction of the County Engineer prior to grading in Phase 4C." Please pass this information on to the Review Engineer for the WPO, so a grading permit is not issued until either this proffer is met or it is amended. It is appropriate for any pedestrian paths within phase 4C to connect to the path system for Fontana. I haven't reviewed it for this. I recommend a note on the final plat per proffer #5 and the new trails within phase 4C: "The Owner shall not request that the County issue the ninth (9th) building permit until the paths have been completed to the satisfaction of the County Engineer." 2. It does not appear the proffer #4 of ZMA 2004 -018 is met. The plan does not appear to indicate any existing trees. Please also make the Review Engineer for the WPO aware that a tree conservation plan is required to be approved prior approval of the e &s plan. I recommend that the required new trees be bonded prior to signature / final approval of the final plat. recommend a note on the final plat per proffer #4: "The owner shall not request a certificate of occupancy until a final zoning inspection is performed and all required trees are in place." 3. Please be advised that per proffer #8, "The Owner shall not submit an application for an erosion and sediment control permit for grading until improvements have been completed for phases 1, 2,3 and 4A and 413 of the Fontana Subdivision and all bonds held by the County in conjunction with subdivision, stormwater management, and erosion control for prior phases have been released by the County. 4. 1 recommend a note on the plat per proffer #9: The colors for the fagade treatments and the colors and materials for the roofs shall be subject to prior approval by the Director of Planning." 5. The Cascadia Connector needs to actually connect to the road. If the roadway has shifted from the recorded access easement, it will need to be extended. 6. Proffer #2 basically calls for an overlot grading plan. The Review Engineer will need to determine if the plan submitted meets the criteria of this proffer. 7. The cover sheet note regarding the rezoning should also list ZMA 2011 -001.