HomeMy WebLinkAboutSUB200800287 Review Comments Preliminary Plat 2012-08-23Megan Yaniglos
From: Oleynik, Megan (VDOT) [ Megan .Oleynik @vdot.virginia.gov]
Sent: Thursday, August 23, 2012 9:38 AM
To: Megan Yaniglos
Cc: Joel DeNunzio, P.E.
Subject: RE: SUB - 2008 -00287 Fontana Phase 4C - Preliminary Plat - correction
Whoops, there was an error with the reference used in the last comment. Here is the correct version.
Megan
From: Oleynik, Megan (VDOT)
Sent: Thursday, August 23, 2012 9:34 AM
To: 'myaniglos @albemarle.org'
Cc: DeNunzio, Joel D., P.E. (VDOT)
Subject: SUB - 2008 -00287 Fontana Phase 4C - Preliminary Plat
Megan,
Joel and I have reviewed the subject plat and have the following comments.
General
Show traffic projections. Road widths should be adequate for projections based on standards in VDOT Road
Design Manual Appendix A. Roads with curb and gutter must be at least 29' wide to accommodate parking on
both sides.
2. Show vertical alignments.
Sheet C3.0.0
3. Curb ramps will be needed at the intersection of Fontana Drive and Brunello Court.
Sheet C3.1.0
4. Horizontal curve radii need to be at least 200' to meet VDOT Road Design Manual standards.
5. Water lines should cross cul -de -sacs at no greater than a 45 degree angle.
Sheet C5.0.0
6. Trees should be planted a minimum of thirty feet from the end of the intersection radius.
Sheet C6.1.0
VDOT Pavement Design Guide specifies that there should be a maximum of 1.5 inches of SM -9.5A asphalt, or 2
inches only if lifted twice.
Please let me know if you have any questions.
Thanks,
Megan Oleynik
Engineering Intern
VDOT - Culpeper District