HomeMy WebLinkAboutWPO201200084 Review Comments Erosion Control Plan 2013-01-07i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Morey Creek Professional Center Plan preparer: Timmons Group Owner or rep.: U.Va. Physicians Group Plan received date: 2 October 2012 (Revl) 3 December 2012 Date of comments: 30 October 2012 (Revl) 7 January 2013 Reviewer: Michael Koslow Review coordinator: Megan Yaniglos SDP201200060, WP0201200084 [fax 29583171 500 Ray C. Hunt Drive Charlottesville, Va. 22903 The 2 "d Site plan and Water Protection Ordinance plans submitted 3 December 2012 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: A) Final Site Development Plans (SDP201200060) 1) VDOT approval is required. Comments will be forwarded by review coordinator when received. [DM905] (Rev]) Comment has been acknowledged. 2) Could not find the 100 year flood plain line on the plan set. Please show the 100 year flood plain labeled on the plan sheets and confirm no flood plain impacts are proposed with this project. (Rev]) Comment has been addressed. 3) Please specify low maintenance ground cover for slopes steeper than 3:1 including area near the north corner of the site. (Revl) Comment has been addressed. 4) Please include a typical retaining wall detail or VDOT wall type designation. Please extend proposed guardrail to all wall areas adjacent to parking or travel ways where wall is > 4' in height. (Rev]) Comment has been addressed. 5) Please provide parking garage entrance profiles to ensure grade breaks and slopes are safe. Please submit parking garage layout and circulation plan for review [18- 32.7.2.A]. (Revl) Comment has been addressed. 6) Please specify inlet shaping for all proposed drainage structures > 4' in height on plans as indicated in drainage calculations. (Rev]) Comment has been addressed. 7) Please revise drainage calculations to remove references to WCBR Vista Room (in SWM Narrative). (Rev]) Comment remains (see 11412013 email to Nick DuBose). Engineering Review Comments Page 2 of 3 B) Stormwater Management and Mitigation Plan (WPO201200084) 1) Please submit a Mitigation plan, application, and fee for proposed work in the 100 ft stream buffer. (Rev]) Please revise mitigation plan as follows: a. Clearly indicate on a standalone plan sheet the proposed stream buffer disturbance area b. Provide a calculation for the required mitigation planting area (see Design Standards Manual - generally 2:1 ratio) c. Provide a planting list which includes a minimum of 85% native plants as described in Piedmont Virginia native plant database: www.albemarle. a- Wativeplants 2) The County of Albemarle cannot endorse any single product or company. Please state on the plans the SWM structure is "ADS Bayfilter" or equivalent filtering design structure. (Rev]) Comment has been addressed. 3) Please include Albemarle County General Construction Notes for Stormwater Management Plans. (Rev]) Comment has been addressed. C) Erosion Control Plan (WPO201200084) 1) Please add the Albemarle County Temporary Paved Construction Entrance to the E &SC portion of the plan. (Rev]) Comment has been addressed. 2) Sediment catchment area #2 appears to be around 2.5 acres of drainage area upon initial grading prior to installation of any drainage structures. Please show adequate sediment control structures for the actual drainage areas prior to commencement of the grading operation. (Rev]) Please shift or reduce scale of Erosion and Sediment Control Plan — Phase I (C3.1) to indicate the entire drainage areas for SBI and SB2 (including off -site drainage areas). Also, calculated dewatering orifice diameters for SBI and SB2 are 3.20" and 3.62" respectively. Please increase dewatering orifice diameters from 2" to 3 ". 3) Silt fence below diversion will be wire - supported due to area draining to silt fence and the silt fence is the only protection for the stream. The silt fence should be installed along a single elevation to allow for filtration instead of diversion to lowest spot along fence. Silt fence installed unevenly creates deep pockets that will fail during a runoff producing rain event. (Rev]) Comment has been addressed. 4) Please revise erosion & sediment control phase I to indicate site protection measures installation prior to site clearing, grubbing, or enclosed drainage structure installation. (Rev]) Comment has been addressed. 5) Please revise plan labels from "Sediment Basin 12.25 acres" to "Sediment Trap 1 2.25 acres" (and same for sediment trap 2) for plan clarity. (Rev1) Please revise label for Sediment Basin 1 on detail labeled "Sediment Trap I" on sheet C3.0. Please revise labels for "STI "and "ST2" on sheet C3.1 to "SBI "and "SB2" for plan clarity. 6) Please describe adjacent property terrain and land use in Adjacent Property section of ESC narrative on sheet C3.0. (Rev]) Comment has been addressed. 7) Please indicate proposed contractor parking and staging areas or clarify if these areas will be contained within proposed limits of disturbance. (Rev]) If the project construction requires parking and /or staging areas which increase the limits of disturbance proposed for construction, this must be indicated at the plan stage level. Comment remains. Engineering Review Comments Page 3 of 3 8) Please clarify intent of "CWD" symbol on sheet C3.1. It appears there needs to be silt fence for west - draining sliver near these areas or other erosion protection measures. Non -VaDCR standard E &SC measures require Program Authority approval for use. (Rev]) Comment has been addressed. 9) Please provide length:width flow path calculations for sediment trap 1 & 2. It appears baffles may be required to ensure 2:1 length:width flow path ratio. (Rev]) Comment has been addressed. Once these comments have been addressed, please submit 2 copies (add 1 more copy if VDOT needs to review, and 1 more if mass - grading that Planning needs to review) of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow @albemarle.org to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: C:AUsers \mkoslow\Documents \Current Reviews \SDP201200060 Morey Creek Office Park - Final \CDDE2_sdp,esc,swm,mp_MAK_Morey Creek Professional Center SDP201200060.doc