Loading...
HomeMy WebLinkAboutSDP201200065 Review Comments Final Site Plan and Comps. 2012-12-05vIRG1N� County of Albemarle Department of Community Development Memorandum To: Stephen Waller (Stephen.waller @gdnsites.com) From: Brent Nelson - Planner Division: Planning Services Date: December 5, 2012 Subject: SDP - 201200065- Shifflett Property - Tier II PWSF, Generator Addition The Planner for the Planning Division of the Albemarle County Department of Community Development will recommend approval for the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Comments 1 thru 3 are preceded by the applicable reference to the Albemarle County Code.] 1. [5.1.4(c)(4)] Prior to issuance of the building permit, the applicant shall submit a tree conservation plan prepared by a certified arborist showing tree protection methods and procedures for existing trees to remain. 2. [5.1.4(d)(8)] Revise Sheet C -6 Details by adding a note indicating that the generator and propane tank shall be Sherwin Williams Java Brown. 3. [5.1.4(c)(7)] The owner of the facility shall submit a report to the agent by no earlier than May or no later than July 1 of each year. The report shall identify each user of the existing structure, and include a drawing, photograph or other illustration identifying which equipment is owned and/or operated by each personal wireless service provider. Multiple users on a single tower or other mounting structure may submit a single report, provided that the report includes a statement signed by a representative from each user acquiescing in the report. This is not a condition of approval for the proposal under review, just a reminder. 4. Miscellaneous /errors: a) The existing and proposed lease area, shown on Sheet C -1 Site Plan, does not match that shown on Sheets C -2 Tree Inventory and C -4 Enlarged Site Plan. Revise Sheet C -1 to correct this. b) Sheet C -1, Site Plan incorrectly references the land space expansion as 10' x 20' when it should be 17' x 20'. Revise Sheet C -1 to correct this. c) On Sheets C -1, Site Plan, C -2 Tree Inventory, C -4 Enlarged Site Plan the new total land space is incorrectly referenced as 30'x 20' when it should be 37' x 20. Revise these sheets to correct this error. d) Plan sheet titles state LTE (4G) Upgrade & Generator Addition. This makes it sound like the proposal includes the monopole extension for the 4G service when that was previously approved as SDP201100081, Verizon- Crossroads. Revise the plan title on each sheet to state Crossroads Site, Shifflett Property, Existing Tier 11 — Generator Addition. Add a note to Sheet G -1 Cover Sheet clearly indicating that this proposal is only for the improvements related to the installation of the proposed generator. Please contact Brent Nelson at the Department of Community Development 296 -5832 ext 3438 for further information.