Loading...
HomeMy WebLinkAboutWPO201200064 Review Comments Bond Estimate 2012-12-06Project Name: Ashcroft Tank & PRV Reconfiguration WPO file number: WP0201200064 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stablization (PS, TS) 1.2 acres $5,000.00 $5,830.00 silt fence (SF) 260.0 ft - $5.00 $1,300.00 silt fence inlet protection (IP) - a $100.00 $800.00 check dam depth in channel 3 ft channel width 15 ft 1 $1,012.50 $1,012.50 construction entrance (CE) 1 $2,000.00 $2,000.00 mobilization $500.00 coat sum $11,442.50 P mgmt $1,716.38 contingency $1,31J89 Total $14, 12/6/2012