Loading...
HomeMy WebLinkAboutSDP201200056 Review Comments Critical Slope Waiver 2012-12-19*—&A County of Albemarle Department of Community Development Memorandum To: Christopher Perez, Current Development planning and zoning review From: Max Greene, Current Development engineering review Date: 20 December 2012 Subject: Yves Delorme, Inc. mia (SDP201200056) critical slope waiver request The critical slope waiver request has been reviewed. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: This existing slope is possibly a man-made slope for the construction of Broadway Street. The applicant is proposing to construct a retaining wall and access road to the rear parcel. Areas Acres Total site 4.145 acres approximately Critical slopes .86 20.75% of site Critical slopes disturbed 0.13 1 15.1% of critical slopes Exemptions to critical slopes waivers for driveways, roads and utilities without reasonable alternative locations: This disturbance is not exempt. Compliance with Zoning Ordinance 18 -4.2: ,'movement of soil and rock" Proper slope construction, control of drainage, and vegetative stabilization will prevent any movement of soil. "excessive stormwater runoff' Stormwater runoff will be reduced in this area, as a portion of the slopes will be eliminated. "siltation" Inspection and bonding by the County will ensure siltation control during construction. Proper stabilization and maintenance will ensure long -term stability. "loss of aesthetic resource" This area is visible from the roads and houses in the neighborhood. Some of the slopes were created with the roads. "septic effluent" This neighborhood is serviced by public sewer. Based on the review above, there are no engineering concerns that prohibit the disturbance of the critical slopes. filc: CDDEI csw MRG Yves Delmore Inc.- mia.doc