Loading...
HomeMy WebLinkAboutWPO201200096 Review Comments Erosion Control Plan 2013-01-14� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Belvedere Phase H SUB201200152 — Road Plan, WP0201200096 Plan preparer: Collins Engineering [fax 2932813] Owner or rep.: Belvedere Station Land Trust; Robert M Hauser & Stan C Manoogian TRS Plan received date: 17 Dec. 2012 Date of comments: 14 Jan. 2013 Reviewer: Max Greene 1. Road and drainage plans (SUB201200152) VDOT comment: The alley entrance widths must be 24 ft for the entrance throat length of 35 ft, but can then taper down to 20 ft. a. VDOT approval is required. [DM905] b. Please show stop signs on alley intersection with public roads. c. County E -911 road name signs are not to be attached to State required traffic control signs. Please show separated signs for each on all intersections. Generally, "Stop" signs are on the right side of the intersection and the E_911 "street name" sign is on the left. d. Please show the signs more prominently if they are not going to be individually labeled on the road plan. e. Please show "No Parking" signs with arrows at the beginning and end of no parking areas with additional "No Parking" signs every 100' or more often between end designation signs. Appears only Colbert Street requires "No Parking" signs. f. Typical street section for Colbert Street needs to show the crown in the road centered on the travel -way with parking on one side of the travel -way and "No Parking" signs on the other. g. Appears parking is allowed on both sides of Dabney Grove, Griffen Grove and Farrow Drive. The "No Parking" signs for these roads may be removed from the plan. h. Please show Farrow Drive 34' curb to curb for the entire length as stated in VDOT preliminary comments and remove note stating the road is to be narrowed between Dabney Grove and Butler Street. i. Please show sight distance easements on the planting plan for review. j. Alleys need drop inlets installed along the edge /curbing and on each side of entrances to prevent the runoff producing storm event from entering the street. k. Please change all turning radii to a minimum 25' as required in the preliminary plan approval. 1. Miles and Philips alleys are shown with over 10% slopes. Engineering Review Comments Page 2 of 3 2. Stormwater Management and Mitigation Plan (WPO201200096) a. Please provide an adequate channel analysis for runoff from proposed construction. Analysis could be proven given: i. Adherence to VESCH MS -19 requirements (see 4VAC50- 30 -40, MS -19 sec. b (1)): The applicant shall demonstrate that total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage areas of the project in question. A report or plan depiction with analysis to this point could prove channel adequacy. ii. adherence to VA code 10.1- 603.4(7): essentially, the required condition for an on -site solution without looking downstream for a 24 hour 1.5, 2, and 10 -year intensity event - (post - development) Peak flow rate <= Pf *Vf/Vp Where Pf = peak flow rate in a forested condition Vf = runoff volume in a forested condition Vp = runoff volume proposed b. Type III retention basin does not appear designed in accordance with VSMH 3.06. Basin appears to be a shell for the construction of a retention basin. Please show appropriate shoreline fringe, riparian fringe, and flood plain terrace vegetation in accordance with expected frequency and duration of inundation. Selection and installation guidelines should be per Minimum Standards 3.05, Landscaping. 3. Erosion Control Plan (WPO201200096) a. Please add this note to the plan "SB #1B will not be removed until the road and drainage system is installed and approved by the WPO Inspector." b. A portion of the proposed grading and retaining wall are off the page in the lower right hand corner of the plan sheets. Please show the entire project for adequate review. Additional comments may be forthcoming due to missing information for what appears to be an unprotected swale and wall construction. c. Please show the full extent of the paths to be constructed and how they will be protected. Fire and Rescue Comments: Based on Road Plan dated 12/13/12 1. Fire Hydrant spacing shall be 500 feet per travelway. I have the PDF copy showing the hydrant locations discussed with your office. 2. Turning Radii shall be no less then 25 ft 3. Roads with parking on one side shall be marked 'NO Parking" per the VSFPC D103.6 4. All roads need to maintain a 20 ft wide clear path of travel at all times. Streets need to be marked accordingly. Engineering Review Comments Page 3 of 3 ACSA Comments: ACSA comments have been forwarded to the applicant /consultant by ACSA. File: CDDE1_rp,esc,swm_MRG_Belvedere Phase ILdoc