HomeMy WebLinkAboutSUB201200129 Review Comments Bond Estimate 2013-01-09The Preserve at Glenmore Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed % compete adjustment for inlle cost remaining Grey Heron Road 10 +00 to 20 +69 road length 1069.0 ft aggregate base 6.0 in of 1069.0 ft L 20.0 ft W 748.3 ton $35.00 $26,190.50 0% $26,190.50 blotted or prime &double seal 1069.0 ft L 20.0 ft W 2375.6 sy $0.00 $0.00 0% $0.00 asphalt base 2.5 in of 1069.0 ft L 20.0 ft W 327.4 tons $100.00 $32,738.13 0% $32,738.13 asphalt surface 1.5 in of 1069.0 ft L 20.0 ft W 196.4 tons $120.00 $23,571.45 0% $23,571.45 curb CG -2 0.0 ft $13.00 $0.00 0% $0.00 curb CG -6 0.0 ft $15.00 $0.00 0% $0.00 sidewalk, concrete (6) 0.0 ft $17.00 $0.00 0% $0.00 ramp CG -12 Oft $350.00 $0.00 0% $0.00 street name sign 1 $200.00 $200.00 0% $200.00 traffic control sign 2 $200.00 $400.00 0% $400.00 Street Landscape 0 Each 0 $150.00 $0.00 0% $0.00 guardrail 0 ES @ 0 0.0 ft $17.00 $0.00 0% $0.00 drop inlet or grate 2 $3,500.00 $7,000.00 0% $7,000.00 standard manhole frame top (not inlet) 1 $500.00 $500.00 0% $500.00 manhole structure (per ft. rise) 16 $450.00 $7,200.00 0% $7,200.00 pipe, rcp, cmp (15 to 48 ") 15.0 in d 3 ES -1,2 2 EC -1 427.0 ft $35.00 $17,445.00 0% $17,445.00 rip -rap, placed 2.0 ft d 21.0 ft L 9.3 ft W 29.1 ton $60.00 $1,748.25 0% $1,748.25 clear and grub (for wooded sites) 1075.0 ft L 50.0 ft W 1.2 acre $24,000.00 $29,614.33 0% $29,614.33 grading (per cy for out or import only) 0.0 cy fill 4000.0 cy cut 4000.0 cy $13.00 $104,000.00 0% $104,000.00 as -built drawings (1k+ price per 0.1 mi.) 1069.0 ft 0.20246 mi. 3 $2,000.00 $7,000.00 0% $7,000.00 survey and layout (price per 0.1 mi.) 1069.0 ft L 0.20246 mi. 3 $2,000.00 $7,000.00 0% $7,000.00 mobilization 1 $500.00 $500.00 0% $500.00 materials testing 1069.0 ft L 2.138 inc of 500' 3 $200.00 $640.00 0% $640.00 compaction testing 1069.0 ft L 2.138 inc of 500' 3 $200.00 $640.00 0% $640.00 CBR tests (1 every 0.1 mi. per road) 1069.0 ft L 2.138 inc of 500' 3 $200.00 $640.00 0% $640.00 stone depth inspections 1069.0 ft L 2.138 Inc of 500' 3 $200.00 $640.00 0% $640.00 pavement inspections 1069.0 ft L 2.138 inc of 500' 3 $200.00 $640.00 0% $640.00 pipe and drainage video inspections 400 ft $1.00 $400.00 0% $400.00 VDOT surety (1 lane) 1069.0 ft L 0.20246 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 VDOT maintenance fee (1 In rd, 1 yr) 1069.0 ft L 0.20246 mi. 0 Lanes $150.00 $0.00 0% $0.00 VDOT admin. Cost recovery fee(1 lane) 1069.0 ft L 0.20246 mi. 0 Lanes $100.00 $0.00 0% $0.00 cost sum $268,707.65 $268,707.65 proj mgmt $40,306.15 $40,306.15 contingency $30,901.38 $30,901.38 Total $339,920 $339,920 1/9/2013