HomeMy WebLinkAboutWPO201100100 Review Comments Bond Estimate 2013-01-16New Era Properties LLC Site - Avon St. Ext
WPO file WP0201100100
Erosion and Sediment Control Bond Estimate
Item Item
Number
lil
2
stablization (PS, TS)
pipe diameter
sit fence (SF)
6 t
safety fence (SAF)
2 t
diversion (DD, FD, RWD)
cut at high side
temporary slope drain(TSD)
pipe length
temporary sediment trap (ST or CIP)
60 t
3 t
height of dam at toe
loft
height of dam at face
(cut vol)
length of dam
15 t
top width
770.4
(comp. fill vat)
(spillway stone tons)
length of spillway
6 t
width of spillway
temporary sediment trap (ST or CIP)
6 t
cut at high side
height of dam at toe
100 t
height of dam at face
60 t
length of dam
width of cut
top width
733.3 cy
(comp. fill vol)
275.6 cy
length of spillway
icy ash
width of spillway
sit fence inlet protection (IP)
(spillway stone tons)
stone inlet protection (IP)
15 t
outlet protection (OP)
length
channel (SCC, matted)
length
check dam
depth in channel
construction entrance (CE)
0 ft
wash rack
length
paved construction entrance
0.0
rip-rap, placed
depth
1
width
survey and layout (price per 0.1 mi.)
acres
mobilization
stream crossing (computed independently)
0 t
pipe diameter
0 in
6 t
cut at dam
2 t
6 t
cut at high side
3 t
100 t
length of cut
60 t
3 t
width of cut
loft
733.3 cy
(cut vol)
111.1 cy
15 t
icy ash
770.4
10 t
(spillway stone tons)
0
6 t
cut at dam
2 t
6 t
cut at high side
6 t
100 t
length of cut
60 t
3 t
width of cut
15 t
733.3 cy
(cut vol)
275.6 cy
15 t
icy ash
825.2
10 t
(spillway stone tons)
0
15 t
width
loft
0 t
width
0 t
0 t
channel width
0 ft
0 ft
length
0.0 it
0.0
(tons)
0
1
traps and basins
2
No. Unit
Unit Cost
Cost
$0.00
(installed)
$0.00
3.5 acres
$5,000.00
$17,500.00
440.0 ft
$5.00
$2,200.00
0.0 t
$5.00
$0.00
1650 t
$13.00
$21,450.00
$0.00
$0.00
$13.00
$50.00 $10,014.81
$50.00
$10,727.41
0 $100.00
$0.00
0 $200.00
$0.00
0 $675.00
$0.00
0
$0.00
0 $0.00
$0.00
0 $2,000.00
$0.00
0 $2,000.00
$0.00
1 $3,500.00
$3,500.00
$60.00 $0.00
$1,500.00
$500.00
cost sum $67,392.22
pro] mgmt $10,108.83
contingency $7,750.11
Total $85,260
Method for volu-
(tenth) x (total widt
assume face at 2:
total width = 3%(tol
average height = (
Method for volumf
( lenth) x (total widt
assume face at 2:
total width = 3%(tol
average height = (
1/16/2013