Loading...
HomeMy WebLinkAboutWPO201100100 Review Comments Bond Estimate 2013-01-16New Era Properties LLC Site - Avon St. Ext WPO file WP0201100100 Erosion and Sediment Control Bond Estimate Item Item Number lil 2 stablization (PS, TS) pipe diameter sit fence (SF) 6 t safety fence (SAF) 2 t diversion (DD, FD, RWD) cut at high side temporary slope drain(TSD) pipe length temporary sediment trap (ST or CIP) 60 t 3 t height of dam at toe loft height of dam at face (cut vol) length of dam 15 t top width 770.4 (comp. fill vat) (spillway stone tons) length of spillway 6 t width of spillway temporary sediment trap (ST or CIP) 6 t cut at high side height of dam at toe 100 t height of dam at face 60 t length of dam width of cut top width 733.3 cy (comp. fill vol) 275.6 cy length of spillway icy ash width of spillway sit fence inlet protection (IP) (spillway stone tons) stone inlet protection (IP) 15 t outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) 0 ft wash rack length paved construction entrance 0.0 rip-rap, placed depth 1 width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 0 t pipe diameter 0 in 6 t cut at dam 2 t 6 t cut at high side 3 t 100 t length of cut 60 t 3 t width of cut loft 733.3 cy (cut vol) 111.1 cy 15 t icy ash 770.4 10 t (spillway stone tons) 0 6 t cut at dam 2 t 6 t cut at high side 6 t 100 t length of cut 60 t 3 t width of cut 15 t 733.3 cy (cut vol) 275.6 cy 15 t icy ash 825.2 10 t (spillway stone tons) 0 15 t width loft 0 t width 0 t 0 t channel width 0 ft 0 ft length 0.0 it 0.0 (tons) 0 1 traps and basins 2 No. Unit Unit Cost Cost $0.00 (installed) $0.00 3.5 acres $5,000.00 $17,500.00 440.0 ft $5.00 $2,200.00 0.0 t $5.00 $0.00 1650 t $13.00 $21,450.00 $0.00 $0.00 $13.00 $50.00 $10,014.81 $50.00 $10,727.41 0 $100.00 $0.00 0 $200.00 $0.00 0 $675.00 $0.00 0 $0.00 0 $0.00 $0.00 0 $2,000.00 $0.00 0 $2,000.00 $0.00 1 $3,500.00 $3,500.00 $60.00 $0.00 $1,500.00 $500.00 cost sum $67,392.22 pro] mgmt $10,108.83 contingency $7,750.11 Total $85,260 Method for volu- (tenth) x (total widt assume face at 2: total width = 3%(tol average height = ( Method for volumf ( lenth) x (total widt assume face at 2: total width = 3%(tol average height = ( 1/16/2013