Loading...
HomeMy WebLinkAboutSDP201300005 Review Comments Minor Amendment 2013-02-11�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Hollymead Substation Expansion- Minor Amendment to SDP - 1984 -60 Plan preparer: Geosyntec Consultants [fax 804 - 767 -2182] Owner or rep.: Virginia Electric & Power CO Plan received date: 22 Jan 2013 Date of comments: 11 Feb 2013 Reviewer: Michelle Roberge A. Site Development Plan (SDP201300005) 1. It appears there is one critical slope located south of site that will be be slightly disturbed during the construction of the additional gravel area. It also appears that the runoff for the entire site will be routed into a stormsewer with the outflow concentrated near the critical slope area. The applicant requesting the waiver shall file a written request explaining how the waiver, if granted, would address the rapid and/or large -scale movement of soil and rock, excessive stormwater run- off, siltation of natural and man -made bodies of water, loss of aesthetic resources, and, in the event of septic system failure, a greater travel distance of septic effluent (collectively referred to as the "public health, safety, and welfare factors ") that might otherwise result from the disturbance of critical slopes. [Section 4.2.5] 2. Please show the drainage easements within the property boundary. 3. The property drains into a lake managed by the Forest Lakes Community. Per Section 17.314 and section 17.315, water quality and quantity will need to be addressed. A WPO application can be filled out for the stormwater management and erosion and sediment control review. The load reduction calculation spreadsheet can be found on our website, www .albemarle.org/deptforms.asp ?department =cdd. The file name is Plan Review BMP Removal Rate Computations. 4. Please show the the VDOT Flared End Section ES -1 for the outlet pipe. 5. The area between the proposed grate inlets will start ponding. Please revise to prevent ponding. 6. Please provide the detail of the F wide wall located south of site. 7. On sheets 5 and 9 for post development, please do not show the grate inlet and pipe to be removed. 8. Please revise E2 to be a 24" RCP outlet pipe. 9. The site will eventually drain into (2) — 12" DIP before entering the pond. Please replace pipes with a 24" RCP. This will require permission from the Forest Lakes Community Association, Inc. Please provide. Sincerely, Michelle Roberge County Engineer File: E1_rp,esc,swm,fsp_GEB template.doc