Loading...
HomeMy WebLinkAboutWPO201200091 Review Comments Bond Estimate 2013-01-29Keswick Club LLC - Golf Course WPO file number: WPO201200091 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) Unit Cost sip fence (SF) safety fence (SAF) diversion (DD, FD, FWD) $5,000.00 temporary slope drain (TSD) pipe length 1 temporary sediment trap (ST or CIP) $53,000.00 0.0 ft height of dam at tae $0.00 height of dam at face $13.00 length of dam top width $0.00 (cane. fill vd) length of spillway width of spillway 2 temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (camp. fill Vol) length of spillway width of spillway 2A temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 3 temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 3A temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 4 temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 5 temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 5A temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 6 temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 6A temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 7 temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) length of spillway width of spillway 8 temporary sediment trap (ST or CIP) height of dam at tce height of dam at face length of dam top width (cane. fill Vol) 0 ft pipe diameter 0 in 0 ft cut at dam 4 it 0 it cut at high side 5 It 0 ft length of cut 28 it 0 it width of cut 14 It 0.0 cy (cut Vol) 149.3 cy 6 it (cy est) 149.3 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 It 0 ft length of cut 38 it 0 it width of cut 19 It 0.0 cy (cut Vol) 234.3 cy 6 it (cy est) 234.3 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 It 0 ft length of cut 24 it 0 it width of cut 12 It 0.0 cy (cut Vol) 120.0 cy 6 it (cy est) 720.0 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 It 0 ft length of cut 32 it 0 it width of cut 16 It 0.0 cy (cut Vol) 181.3 cy 6 it (cy est) 181.3 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 It 0 ft length of cut 40 it 0 it width of cut 20 It 0.0 cy (cut Vol) 253.3 cy 6 it (cy est) 253.3 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 it 0 ft length of cut 36 it 0 it width of cut 18 It 0.0 cy (cut Vol) 216.0 cy 6 it (cy est) 216.0 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 it 0 ft length of cut 30 it 0 it width of cut 15 It 0.0 cy (cut Vol) 165.0 cy 6 it (cy est) 165.0 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 it 0 ft length of cut 26 it 0 it width of cut 13 It 0.0 cy (cut Vol) 134.3 cy 6 it (cy est) 134.3 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 It 0 ft length of cut 40 it 0 it width of cut 20 it 0.0 cy (cut Vol) 253.3 cy 6 it (cy est) 253.3 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 It 0 ft length of cut 40 it 0 it width of cut 20 It 0.0 cy (cut Vol) 253.3 cy 6 it (cy est) 253.3 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 it 0 ft length of cut 24 it 0 it width of cut 12 It 0.0 cy (cut Vol) 120.0 cy 6 it (cy est) 720.0 8 ft (spillway stone tans) 2.7 0 ft cut at dam 4 it 0 it cut at high side 5 It 0 ft length of cut 38 it 0 it width of cut 19 It 0.0 cy (cut Vol) 234.3 cy No. Unit Unit Cost Cost (installed) 71.0 acres $5,000.00 $355,000.00 10600.0 it $5.00 $53,000.00 0.0 ft $5.00 $0.00 0 it $13.00 $0.00 $0.00 $0.00 $13.00 $50.00 $2,076.33 $13.00 $50.00 $3,181.33 $13.00 $50.00 $1,695.00 $13.00 $50.00 $2,492.33 $13.00 $50.00 $3,428.33 $13.00 $50.00 $2,943.00 $13.00 $50.00 $2,280.00 $13.00 $50.00 $1,881.33 $13.00 $50.00 $3,428.33 $13.00 $50.00 $3,428.33 $13.00 $50.00 $1,695.00 $13.00 Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (ler th) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (ler th) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( Method for vdumr (lenth) x (total wid assume face at 2: total width = 3x(to average height = ( 1/29/2013 Keswick Club LLC - Golf Course WPO file number: WPO201200091 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) length of spillway 6 ft (cy est) 234.3 width of spillway 8 ft (spillway stone tans) 2.7 $50.00 $3,181.33 8A temporary sediment trap (ST or CIP) Method for volume height of dam at tae 0 ft cut at dam 4 ft (lenth) x (total wid height of dam at face 0 ft cut at high side 5 it assume face at 2: length of dam 0 ft length of cut 22 ft total width = 3x(to, top width 0 ft width of cut 71 it average height = (cane. fill vol) 0.0 cy (cut Vol) 106.3 cy $13.00 length of spillway 6 ft (cy est) 106.3 width of spillway 8 ft (spillway stone tans) 2.7 $50.00 $1,517.33 9 temporary sediment trap (ST or CIP) Method for volume height of dam at tae 0 ft cut al: dam 4 ft (lenth) x (total wid height of dam at face 0 ft cut at high side 5 it assume face at 2: length of dam 0 ft length of cut 30 fl total width = 3x(to top width 0 ft width of cut 15 it average height = (cane. fill Vol) 0.0 cy (cut Vol) 165.0 cy $13.00 length of spillway 6 ft (cy est) 165.0 width of spillway 8 ft (spillway stone tans) 2.7 $50.00 $2,280.00 10 temporary sediment trap (ST or CIP) Method for volume height of dam at tae 0 ft cut al: dam 4 ft (lenth) x (total wid height of dam at face 0 ft cut at high side 5 it assume face at 2: length of dam 0 ft length of cut 26 ft total width = 3x(to top width 0 ft width of cut 13 it average height = (cane. fill Vol) 0.0 cy (cut Vol) 134.3 cy $13.00 length of spillway 60 ft (cy est) 134.3 width of spillway 8 ft (spillway stone tans) 2.7 $50.00 $1,881.33 11 temporary sediment trap (ST or CIP) Method for volume height of dam at tae 0 ft cut al: dam 4 ft (lenth) x (total wid height of dam at face 0 ft cut at high side 5 it assume face at 2: length of dam 0 ft length of cut 36 fl total width = 3x(to top width 0 ft width of cut 18 ft average height = (cane. fill Vol) 0.0 cy (cut vd) 216.0 cy $13.00 length of spillway 60 ft (cy est) 216.0 width of spillway 8 ft (spillway stone tans) 2.7 $50.00 $2,943.00 12 temporary sediment trap (ST or CIP) Method for volume height of dam at ice 0 ft cut at dam 4 it (lenth) x (total wid height of dam at face o ft cut at high side 5 M assume face at 2: length of dam 0 ft length of cut 26 it total width = 3x(to, tap width 0 ft width of cut 13 fl average height = (cane. fill Vol) 0.0 cy (cut Vol) 134.3 cy $13.00 length of spillway 60 ft (cy est) 134.3 width of spillway 8 ft (spillway stone tons) 2.7 $50.00 $1,881.33 13 temporary sediment trap (ST or CIP) Method for volume height of dam at ice 0 ft cut at dam 4 it (lenth) x (total wid height of dam at face 0 ft cut at high side 5 M assume face at 2: length of dam 0 ft length of cut 26 it total width = 3x(to, tap width 0 ft width of cut 13 fl average height = (cane. fill volt 0.0 cy (cut vol) 134.3 cy $13.00 length of spillway 60 ft (cy est) 134.3 width of spillway 8 ft (spillway stone tons) 2.7 $50.00 $1,881.33 14 temporary sediment trap (ST or CIP) Method for volume height of dam at ice 0 ft cut at dam 4 it (lenth) x (total wid height of dam at face o ft cut at high side 5 M assume face at 2: length of dam 0 ft length of cut 28 it total width = 3x(to, tap width 0 ft width of cut 14 fl average height = (cane. fill Vol) 0.0 cy (cut Vol) 149.3 cy $13.00 length of spillway 60 ft (cy est) 149.3 width of spillway 8 ft (spillway stone tons) 2.7 $50.00 $2,076.33 15 temporary sediment trap (ST or CIP) Method for volume height of dam at ice 0 ft cut at dam 4 it (lenth) x (total wid height of dam at face 0 ft cut at high side 5 M assume face at 2: length of dam 0 ft length of cut 18 it total width = 3x(to, tap width 0 ft width of cut 9 fl average height = (cane. fill Vol) 0.0 cy (cut Vol) 81.0 cy $13.00 length of spillway 60 ft (cy est) 81.0 width of spillway 8 ft (spillway stone tons) 2.7 $50.00 $1,188.00 16 temporary sediment trap (ST or CIP) Method for volume height of dam at ice 0 ft cut at dam 4 it (lenth) x (total wid height of dam at face o ft cut at high side 5 M assume face at 2: length of dam 0 ft length of cut 38 it total width = 3x(to, tap width 0 ft width of cut 19 ft average height = (cane. fill Vol) 0.0 cy (cut Vol) 234.3 cy $13.00 length of spillway 60 ft (cy est) 234.3 width of spillway 8 ft (spillway stone tons) 2.7 $50.00 $3,181.33 17 temporary sediment trap (ST or CIP) Method for volume height of dam at ice 0 ft cut at dam 4 it (lenth) x (total wid height of dam at face 0 ft cut at high side 5 M assume face at 2: length of dam 0 ft length of cut 26 it total width = 3x(to, tap width 0 ft width of cut 13 it average height = (cane. fill Vol) 0.0 cy (cut Vol) 134.3 cy $13.00 length of spillway 60 ft (cy est) 134.3 width of spillway 8 ft (spillway stone tons) 2.7 $50.00 $1,881.33 18 temporary sediment trap (ST or CIP) Method for volume height of dam at ice 0 ft cut at dam 4 it (lenth) x (total wid height of dam at face 0 ft cut at high side 5 M assume face at 2: length of dam 0 ft length of cut 36 it total width = 3x(to, tap width 0 ft width of cut 18 fl average height = (cane. fill Vol) 0.0 cy (cut Vol) 216.0 cy $13.00 length of spillway 60 ft (cy est) 216.0 width of spillway 8 ft (spillway stone tons) 2.7 $50.00 $2,943.00 19 temporary sediment trap (ST or CIP) Method for volume height of dam at ice 0 ft cut at dam 4 it (lenth) x (total wid height of dam at face 0 ft cut at high side 5 M assume face at 2: length of dam 0 ft length of cut 26 it total width = 3x(to, tap width 0 ft width of cut 13 fl average height = (cane. fill Vol) 0.0 cy (cut Vol) 134.3 cy $13.00 length of spillway 60 ft (cy est) 134.3 width of spillway 8 ft (spillway stone tons) 2.7 $50.00 $1,881.33 20 temporary sediment trap (ST or CIP) Method for volume 1/29/2013 Keswick Club LLC - Golf Course $13.00 1 WPO file number: WPO201200091 1 $2,000.00 $2,000.00 Erosion and Sediment Control Bond Estimate $3,500.00 $3,500.00 Item Item $53,500.00 Number $500.00 cost sum $548,286.67 height of dam at toe 0 ft cut at dam 4 It $63,052.97 height of dam at face o It cut at high side 5 it length of dam 0 ft length of cut 26 It tap width 0 It width of cut 13 tt (camp. fill vol) 0.0 cy (cut vol) 134.3 cy length of spillway 60 It Icy est) 134.3 width of spillway 8 ft (spillway Stone tons) 2.7 21 temporary sediment trap (ST or CIP) height of dam at ice 0 ft cut at dam 4 It height of dam at face 0 It cut at high side 5 ft length of dam 0 ft length of cut 28 It tap width 0 It width of cut 14 tt (camp. fill Vol) 0.0 cy (cut Vol) 149.3 cy length of spillway 60 It Icy est) 149.3 width of spillway 8 ft (spillway Stone tons) 2.7 22 temporary sediment trap (ST or CIP) height of dam at toe 0 ft cut at dam 4 It height of dam at face 0 It cut at high side 5 ft length of dam 0 ft length of cut 38 It tap width 0 It width of cut 19 tt (camp. fill Vol) 0.0 cy (cut Vol) 234.3 cy length of spillway 60 It Icy est) 234.3 width of spillway 8 ft (spillway Stone tons) 2.7 23 temporary sediment trap (ST or CIP) height of dam at ice 0 ft cut at dam 4 It height of dam at face 0 It cut at high side 5 ft length of dam 0 ft length of cut 30 It tap width 0 It width of cut 15 tt (camp. fill Vol) 0.0 cy (cut Vol) 165.0 cy length of spillway 60 It Icy est) 165.0 width of spillway 8 ft (spillway Stone tons) 2.7 24 temporary sediment trap (ST or CIP) height of dam at toe 0 ft cut at dam 4 It height of dam at face o It cut at high side 5 ft length of dam 0 ft length of cut 32 It tap width 0 It width of cut 16 tt (camp. fill Vol) 0.0 cy (cut Vol) 181.3 cy length of spillway 60 It Icy est) 181.3 width of spillway 8 ft (spillway Stone tons) 2.7 25 temporary sediment trap (ST or CIP) height of dam at toe 0 ft cut at dam 4 It height of dam at face o It cut at high side 5 ft length of dam 0 ft length of cut 28 It tap width 0 It width of cut 14 tt (camp. fill Vol) 0.0 cy (cut Vol) 149.3 cy length of spillway 60 It Icy est) 149.3 width of spillway 8 ft (spillway Stone tons) 2.7 26 temporary sediment trap (ST or CIP) height of dam at toe 0 ft cut at dam 4 It height of dam at face 0 It cut at high side 5 ft length of dam 0 ft length of cut 38 It tap width 0 It width of cut 19 tt (camp. fill Vol) 0.0 cy (cut Vol) 234.3 cy length of spillway 60 It Icy est) 234.3 width of spillway 8 ft (spillway Stone tons) 2.7 27 temporary sediment trap (ST or CIP) height of dam at toe 0 ft cut at dam 4 It height of dam at face o It cut at high side 5 ft length of dam 0 ft length of cut 38 It tap width 0 It width of cut 19 ft (camp. fill Vol) 0.0 cy (cut Vol) 234.3 cy length of spillway 60 It Icy est) 234.3 width of spillway 8 ft (spillway Stone tons) 2.7 28 temporary sediment trap (ST or CIP) height of dam at ice 0 ft cut at dam 4 It height of dam at face o It cut at high side 5 ft length of dam 0 ft length of cut 36 It tap width 0 It width of cut 18 tt (camp. fill Vol) 0.0 cy (cut Vol) 216.0 cy length of spillway 60 It Icy est) 216.0 width of spillway 8 ft (spillway stone tons) 2.7 channel (SCC, matted) length f ft width f 0 tt check dam depth in channel 1 It channel width loft construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth 2 It length 1.0 ft width 1.0 (tons) 0.15 survey and layout (price per 0.1 mi.) acres 71 traps and basins 36 mobilization Stream crossing (computed independently) No. Unit Unit Cost Cost (installed) $13.00 $50.00 $1,881.33 $13.00 $50.00 $2,076.33 $13.00 $50.00 $3,181.33 $13.00 $50.00 $2,280.00 $13.00 $50.00 $2,492.33 $13.00 $50.00 $2,076.33 $13.00 $50.00 $3,181.33 $13.00 $50.00 $3,181.33 $13.00 $50.00 $2,943.00 (IeMh) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (IeMh) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (IeMh) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (lenth) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (lemh) , (total Mid assume face at 2: total width = 3,(to average height = ( Method for volume (lemh) , petal Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (lemh) , petal Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (Tenth) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (Tenth) , (total Mid assurne face at 2: total width = 3,(to average height = ( 1/29/2013 $13.00 1 $225.00 $225.00 1 $2,000.00 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $60.00 $9.00 $53,500.00 $500.00 cost sum $548,286.67 proj mgmt $82,243.00 contingency $63,052.97 Total $693,590 (IeMh) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (IeMh) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (IeMh) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (lenth) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (lemh) , (total Mid assume face at 2: total width = 3,(to average height = ( Method for volume (lemh) , petal Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (lemh) , petal Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (Tenth) , (total Mid assurne face at 2: total width = 3,(to average height = ( Method for volume (Tenth) , (total Mid assurne face at 2: total width = 3,(to average height = ( 1/29/2013