HomeMy WebLinkAboutWPO201300005 Review Comments Erosion Control Plan 2013-02-13�� OF A
i"
A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax(434)972 -4126
Project:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewer:
Kings Grant Dams WP0201300005
Gloeckner Engineering [glocknerengineering @ gmail. com]
Woodlands Road LLC [unknown]
5 February 2013
13 February 2013
Max Greene
The Water Protection Plans (WP0201300005) submitted 22 January 2011 have received
Engineering Review and do not appear to meet Albemarle County minimum checklist
items for approval. Please adequately address the following comments for final approval:
B. Stormwater Management and Mitigation Plan (WP0201300005)
a. Please clarify the areas of mitigation on the plan sheets.
i. The proposed stream buffer disturbance will require mitigation shown on
the plan.
ii. Is this plan to amend the original plan? If so, please show how and where.
b. Please show the existing vegetation on the plan sheet.
c. Please show any critical slopes areas on the plan sheet.
2. C. Erosion Control Plan (WP0201300005)
a. Plan appears to lack enough information for construction. Please show all areas
of work to construct this project.
b. Please submit any information from the Army Corp of Engineers for stream
disturbance.
c. Appears a second construction entrance and haul road will be required for the
basin on the right side of the page.
d. Please label the basins for review and construction.
e. Please show the calculations for the basin constructions.
f. Wire - supported silt fence across a stream/swale is not approvable per VESCH.
Please show how the storm flows will be addressed during construction. All
construction will be performed "in the dry ".
g. Please show construction/design details for the basins.
h. Please show where the soil for the dams will be excavated and, if needed, how the
area will be protected and reestablished with vegetation.
Please show drainage profiles on the plan sheet.
Please show and label the size of all drainage pipes on the plan sheet.
Due to the extent of comments, additional comments or conditions may be forthcoming.
Engineering Review Comments
Page 2 of 2
Once these comments have been addressed, please submit 2 copies of the revised plans,
calculations, and narratives to Current Development Engineering along with the required review
fee and transmittal form.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these
review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email
mgreene @albemarle.org to schedule an appointment.
[17- 204.f] An application for an erosion and sediment control plan that requires modifications,
terms, or conditions to be included in order for it to be approved shall be deemed to be
withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms
or conditions within six (6) months after the owner is informed of the omitted information as
provided under paragraph (B).
File: CDDEl_esc,mp_MRG_Kings Grant Dams.doc