Loading...
HomeMy WebLinkAboutWPO201300005 Review Comments Erosion Control Plan 2013-02-13�� OF A i" A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax(434)972 -4126 Project: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Kings Grant Dams WP0201300005 Gloeckner Engineering [glocknerengineering @ gmail. com] Woodlands Road LLC [unknown] 5 February 2013 13 February 2013 Max Greene The Water Protection Plans (WP0201300005) submitted 22 January 2011 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: B. Stormwater Management and Mitigation Plan (WP0201300005) a. Please clarify the areas of mitigation on the plan sheets. i. The proposed stream buffer disturbance will require mitigation shown on the plan. ii. Is this plan to amend the original plan? If so, please show how and where. b. Please show the existing vegetation on the plan sheet. c. Please show any critical slopes areas on the plan sheet. 2. C. Erosion Control Plan (WP0201300005) a. Plan appears to lack enough information for construction. Please show all areas of work to construct this project. b. Please submit any information from the Army Corp of Engineers for stream disturbance. c. Appears a second construction entrance and haul road will be required for the basin on the right side of the page. d. Please label the basins for review and construction. e. Please show the calculations for the basin constructions. f. Wire - supported silt fence across a stream/swale is not approvable per VESCH. Please show how the storm flows will be addressed during construction. All construction will be performed "in the dry ". g. Please show construction/design details for the basins. h. Please show where the soil for the dams will be excavated and, if needed, how the area will be protected and reestablished with vegetation. Please show drainage profiles on the plan sheet. Please show and label the size of all drainage pipes on the plan sheet. Due to the extent of comments, additional comments or conditions may be forthcoming. Engineering Review Comments Page 2 of 2 Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: CDDEl_esc,mp_MRG_Kings Grant Dams.doc