Loading...
HomeMy WebLinkAboutSUB200400288 Review Comments Bond Inspection 2013-02-11��RGYN�A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 11 Feb 2013 Gaylon Beights Beights Corporation PO Box 370 Crozet, VA 22932 Re: Old Trail Creekside Bond Inspection Requests Your bond reduction and release requests for Old Trail Creekside have been processed. Old Trail Creekside, Phase 1 Current bond amount: $186,118 1) The pavement transition between Mountain Path Drive and Mountain Path Court needs to be repaired and sealed to prevent cracking at transition. Please provide the same repair for the pavement transition between Mountain Path Drive and Mountain Path Terrace. Old Trail Creekside III, Phase 1 Current bond amount: $59,600 All comments from Nov 27, 2012 are satisfied. This bond amount is at our minimum amount and can be released. Sincerely, Michelle Roberge County Engineer