HomeMy WebLinkAboutSUB200400288 Review Comments Bond Inspection 2013-02-11��RGYN�A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
11 Feb 2013
Gaylon Beights
Beights Corporation
PO Box 370
Crozet, VA 22932
Re: Old Trail Creekside Bond Inspection Requests
Your bond reduction and release requests for Old Trail Creekside have been processed.
Old Trail Creekside, Phase 1
Current bond amount: $186,118
1) The pavement transition between Mountain Path Drive and Mountain Path Court needs
to be repaired and sealed to prevent cracking at transition. Please provide the same repair
for the pavement transition between Mountain Path Drive and Mountain Path Terrace.
Old Trail Creekside III, Phase 1
Current bond amount: $59,600
All comments from Nov 27, 2012 are satisfied. This bond amount is at our minimum amount
and can be released.
Sincerely,
Michelle Roberge
County Engineer