Loading...
HomeMy WebLinkAboutSUB201300020 Review Comments Final Plat 2013-03-28GIRGSIytP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Rd. North Wing Charlottesville, VA 22902 Phone: 434 - 296 -5832 Memorandum To: Brian Jamison, Roudabush, Gale and Associates, Inc. From: J.T. Newberry - Planner Date: March 28, 2013 Subject: SUB201300020 Old Trail, Blocks 5, 20, and 2 — Final Fax: 434 - 972 -4126 The Albemarle County Current Development Division will grant or recommend approval of the final plat referenced above when the following comments have been addressed. [Each comment is preceded by the applicable reference in the Subdivision/Zoning Ordinances, unless otherwise specified.] [14- 302(A)(2)] Vicinity map. On Sheet 1, please add Block 5 to the label of blocks shown in the vicinity map. 2. [14- 302(B)(2)] Name ofplat preparer. On Sheet 1, please add the name of the person who prepared the plat. 3. [14- 302(B)(8) and Code of Development, p. 311 Yards. On Sheet 1, please revise the setbacks for Block 5 to show "0 feet" for the front, side and rear setbacks. In a separate note, please show the setbacks for Block 20 and Block 21 to be "5 feet" for the front setback, "0 feet" for the side setback and "5 feet" for the rear setback. 4. [Rezoning Plan, Sheet 4 of 91 Transportation Plan. On Sheet 2, please show the areas reserved for the streets identified as `B" and "E" within these blocks. The standards for these streets are also shown on page 23 of the Code of Development. C Please contact J.T. Newberry in the Planning Division at jnewberry(a,albemarle.org or 434- 296 -5832, ext. 3270 for further information about any of the comments above. Engineering Comments Attached below. Please contact Michael Koslow at mkoslowkalbemarle.org or 434 - 296 -5832, ext. 3297 for further information. Fire and Rescue Based on Plat dated 2/7/13 1. All roads require a 20 ft unobstructed travel way. 2. All Radii shall be a minimum of 25 ft. 3. Hydrants shall have a spacing of 500 ft per travelway. Please contact Robbie Gilmer at r ilmer(cr�albemarle.org or 434 - 296- 5833for further information. 1 - _ VDOT Comments will be forwarded as soon as they are received. *—&A County of Albemarle Department of Community Development The final subdivision plat has been reviewed: 1. Please include an indication for Block 5's location on Vicinity Map (appears to point to 5, 20, and 21, but only call out blocks 20 & 21) or modify plat area to only include blocks 20 & 21. 2. Please indicate the proposed public road right of way, SWM easements, and sight distance easements proposed with Edenbrook Park site plan (SDP2012 -00042 preliminary; not yet approved) on this final plat. Final plat approval cannot precede final site plan or WPO plan (not yet submitted) approval for Edenbrook Park. 3. Please indicate proposed water and sewer lines, proposed drainage lines and structures, fire hydrants, and proposed stormwater management facilities after approved on Edenbrook Park site and WPO plans. 4. A VDOT accepted public road or a subdivision - road bond will need to be posted for roads proposed with Edenbrook Park site plan prior to the approval of the final plat. 5. Subdivision — water & sewer (by ACSA) and WPO (ESC and SWM, by the county) bonds will need to be posted prior to the approval of the final plat. 6. Future anticipated fees associated with the engineering review of the final plat and site grading permit and inspection could include but are not limited to: Public Street plan review fee Memorandum To: Jonathan Newberry, Project Planner From: Michael Koslow, Engineering Review (SUB201300020) Project: Old Trail Village Blocks 5, 20, 21 - Final Plat Plan preparer: Roudabush, Gale & Associates Inc. [434- 977 -0205] Owner or rep.: March Mountain Properties, LLC Plan received date: 8 February 2013 Date of comments: 12 March 2013 Reviewer: Michael Koslow The final subdivision plat has been reviewed: 1. Please include an indication for Block 5's location on Vicinity Map (appears to point to 5, 20, and 21, but only call out blocks 20 & 21) or modify plat area to only include blocks 20 & 21. 2. Please indicate the proposed public road right of way, SWM easements, and sight distance easements proposed with Edenbrook Park site plan (SDP2012 -00042 preliminary; not yet approved) on this final plat. Final plat approval cannot precede final site plan or WPO plan (not yet submitted) approval for Edenbrook Park. 3. Please indicate proposed water and sewer lines, proposed drainage lines and structures, fire hydrants, and proposed stormwater management facilities after approved on Edenbrook Park site and WPO plans. 4. A VDOT accepted public road or a subdivision - road bond will need to be posted for roads proposed with Edenbrook Park site plan prior to the approval of the final plat. 5. Subdivision — water & sewer (by ACSA) and WPO (ESC and SWM, by the county) bonds will need to be posted prior to the approval of the final plat. 6. Future anticipated fees associated with the engineering review of the final plat and site grading permit and inspection could include but are not limited to: Public Street plan review fee $250 / each review Erosion & Sediment Control plan review fee $300 / each review Stormwater Management plan & calcs review fee $300 / each review Grading permit and first year inspections fee $100 / disturbed acre 7. A stormwater management maintenance agreement will be required for Edenbrook Park prior to final subdivision plat approval. C:A Users \mt slow \Bocumen_s \Curren_ Reviews \SUB201300020 Old 'frail Village Blcct 2, 21 - inal \l'1 r'Y'1' M1K OUB- 2013 -00020 Old 'frail Village Blocts 20, 21 - rinal.dcc