Loading...
HomeMy WebLinkAboutWPO201300013 Review Comments Erosion Control Plan 2013-03-07�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: 6913 Markwood LLC Plan preparer: David Wyant [fax 823 -2815] Owner or rep.: 6913 Markwood LLC Plan received date: 11 Feb 2013 Date of comments: 7 Mar 2013 Reviewer: Michelle Roberge A. Erosion Control Plan (WP0201300013) 1. The ST located furthest north does not appear to be necessary. A sediment trap can handle up to 3 acres of contributing drainage area. The limits of contruction for the site is about 1.14 acres. Providing diversion dikes along the eastern and southern boundary is an option. See attached sheet. 2. Provide calculations for the sediment trap design. 3. Please show dust control on the plan and narrative. 4. Please show the stockpile area with silt fence around it. 5. It appears that the main objective of this land disturbance is to regrade the parcel, as stated on page 3 of the narrative under the "Waste and Borrow Areas ". A grading plan is required to ensure the topography change will not impact the adjacent properties and a SWM plan is not necessary. Refer to our site plan checklist for grading sheet layout information. 6. It also appears that your plan is missing the title, vicinity map, and professional seal. Please provide. Also, please sign and date the plans. Sincerely, pe M11'11�1 Michelle Roberge File: E1_ rp,esc,swm,fsp_GEB_template.doc 4 c� � � d _Z v a � Ai. es t� y -44 \ OL N 4 k A � _. 4.• f.: t tiT7 It