Loading...
HomeMy WebLinkAboutWPO201200081 Review Comments Bond Estimate 2013-03-08 (3)Grayrock West (aka Lanetown) Subdivision WPO file number: WP0201200081 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed site clearing permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 4 ea $500.00 $2,000.00 manhole structure (per ft. rise) 25 ft $450.00 $11,250.00 pipe, mig, mp(15 to 48') 15.0 in d 1 ES -1,2 1 EC -1 325.0 ft $35.00 $12,375.00 aggregate base or drainage stone 6.0 in d 0.0 ft L 0.0 ft w 0.0 ton $35.00 $0.00 1 basin height of dam at toe 0 ft cuf at dam 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill voil 0.0 cy (cut vol) 0.0 cy $13.00 length of spillway 0 ft (by set) 0.0 width of spillway 0 ft (spillway some tons) 0 $50.00 $0.00 0 (price of base) $0 barrel collars 0 baffle length 0 ft $0.00 Vass 0 as $150.00 $0.00 shrubs 0 as $50.00 $0.00 seedlings 0 as $5.00 $0.00 underdrain (LF) 0 ft $5.00 $0.00 Witter soil mix (C1) 0 cy $38.00 $0.00 trash rack/ anti vortex devices 1 ft $1,500.00 $1,500.00 maintenance access road (LF) 0 ft $50.00 $0.00 np -rap, placed depth 0 ft length 0.0 ft width 0.0 (tans) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 1 basins 1 $1,000.00 mobilization $500.00 as -built drawings (per facility) 1 as $2,000.00 $2,000.00 materials testing (per facility) 1 ea $2,000.00 $2,000.00 compaction testing (per dam) 1 as $5,000.00 $5,000.00 manufactured facilities (attach manufacturers or contractors price as a base cost sum $37,625.00 prof mgmt $5,643.75 contingency $4,326.88 Total $47,600 3/8/2013