Loading...
HomeMy WebLinkAboutWPO201300018 Review Comments Stormwater Management Plan 2013-03-29�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Briarwood Underground Detention Plan preparer: Collins Engineering [293 -3719] Owner or rep.: Woodbriar Associates Plan received date: 4 Mar 2013 Date of comments: 29 Mar 2013 Reviewer: Michelle Roberge A. SWM (WP0201300018) 1. Please include in the title "Amendment to WP0200600066." 2. The " Stormwater Management Narrative" states that plans will not incorporate SWM quality treatment. Please provide the treatment for Briarwood Drive and the future impervious area that is assumed to be 20,000 sf. Please include the reduction rate calcs. 3. Please provide the sub -areas on drainage area maps to match the calculations. For example, since 20,000 sf of future impervious area is assumed, please show as a sub area so that it is clearly documented in the plans. If the future impervious area is amended, we have a reference point to begin with. 4. Please show the SWM easement and access easement for the detention facility. Unobstructed access easements to the manholes and the facility shall be clearly shown. 5. Briarwood Drive has a steep slope and it is important to know the efficiency of the curb inlets (at grade) for the 10 year storm. Please show your calculations to verify the actual flow into the underground detention facility and to verify if additional DI are necessary upslope. 6. Please provide a 48" diameter manhole at the junction of the 15" pipe and the detention facility so that a step ladder can be installed to the bottom of the facility. Please provide the same for the outlet of the detention facility. Label all structures with 48" diameter manhole. 7. Please provide a 48" diameter manhole access at both sides of junction. For STR 1, the 5" low flow orifice can easily clog up and having an additional manhole at the upstream pipe will provide access for maintenance. 8. Please submit a written approval of any manufactured facility from the manufacturer. 9. The pipe layout of the underground detention basin is not like the pipe that is used in the program for routing. The stormwater routing needs to provide accurate volumes. Please provide the volume model generated either by the applicant or by the manufacturer for the routing calcs. 10. Please show the note "All excavation for underground pipe installation must comply with OSHA Standards for Construction Industry (29 CFR Part 1926)," from the Albemarle County general construction notes. 11. Please replace the notes on sheet 3 from "break existing ... pipe" to "saw cut at manhole or replace to the joint." 12. Please address MS -19 per state requirements. 13. Erosion and sediment control plan is required. Sincerely, r&q6de__ Michelle Roberge File: E1_rp,esc,swm,fsp_GEB _ template.doc