Loading...
HomeMy WebLinkAboutSDP201300014 Review Comments Minor Amendment 2013-04-03Phone 434 - 296 -5832 pF aLg� County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Justin Shimp ( Justin (a)shimp— engineerinq.com) From: Ellie Ray, CLA, Senior Planner Division: Planning Date: April 3, 2012 Subject: SDP 201300014 Federal Express Phase 4 - Minor Fax 434 - 972 -4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision /Zoning Ordinances unless otherwise specified.] 1. [32.5.2(a)] Please dimension the boundary lines that are shown on the plan. 2. [32.5.2(a)] Provide a note on the cover sheet regarding the critical slope waiver that was approved with the preliminary site plan. It was associated with SDP1995 -00053 and was approved on July 11, 1995. 3. [32.5.2(a)] Add the names of the owners, zoning district, tax map and parcel number, and present use of the abutting residential parcel. 4. [32.5.2(a) & 21.7] Add a reference in the 'Setbacks' information to the required 20' undisturbed buffer between commercial and residential districts. Show this line on the site plan and note whether or not disturbance of this buffer is proposed. If disturbance is proposed, a waiver will be required. If disturbance is not proposed, please move the `limits of disturbance' line outside of the required buffer. 5. [32.5.2(b)] Provide the maximum square footage of the subject building. 6. [32.5.2(b)] Note the maximum amount of impervious cover on the site. 7. [32.5.2(d)] It appears that the proposed critical slope disturbance is in an area covered by the waiver granted with the preliminary site plan. Due to the critical slope disturbance, and the conditions associated with the waiver, a WPO application must be submitted; please coordinate with Engineering to determine what is required. 8. [32.5.2(f)] Provide the name and location of the adjacent watercourse. 9. [32.5.2(h)] The flood plain line shown does not match County GIS; please verify and show the correct location of the flood plain limits. The stream buffer should also be shown if it extends beyond the flood plain. 10. [32.5.2(n)] Please dimension all proposed walkways, walls, and concrete pads. 11. [32.6.2(g)] Show any existing public utility and drainage easements; if new easements are proposed, they should be noted as dedicated to public use. 12. [32.7.9.4(b)] When existing trees /plants are to be preserved in lieu of planting new materials in order to satisfy landscaping and screening requirements the landscape plan shall indicate the trees to be saved; limits of clearing; location and type of protective fencing; grade changes requiring tree wells or walls; and trenching or tunneling proposed beyond the limits of clearing. In addition, a completed and signed conservation checklist must also be included on the plan. This is required to show that the 20' undisturbed buffer will be maintained. 13. [Comment] This site plan cannot be approved until ACSA and VDOT complete their reviews and grant their approval. Engineering comments have been provided. Inspections, fire /rescue, and ARB have reviewed the plan and have no objections. Please contact Ellie Ray in the Planning Division by using eray(a)albemarle.org or 434 - 296 -5832 ext. 3432 for further information.