Loading...
HomeMy WebLinkAboutSUB201300028 Review Comments Preliminary Plat 2013-03-22Christopher Perez From: Oleynik, Megan (VDOT) [ Megan .Oleynik @vdot.virginia.gov] Sent: Friday, March 22, 2013 11:51 AM To: Christopher Perez Cc: Joel DeNunzio, P.E. Subject: Lochlyn Hills Preliminary Plat Chris, Joel and I have reviewed the subject plan and have the following comments: 1. A 1978 Resolution for the Rio Heights subdivision shows a 50 ft r/w on Penn Park Lane up to .08 miles (447 ft) S. Easterly of the intersection with Rio Road. This existing 50 ft r/w should be shown on the plat and should continue along the proposed section of road. 2. Clearly define and label r/w and easements along Penn Park Lane. 3. The proposed section of Penn Park Lane should be centered within the r/w with curb and gutter on both sides and sidewalk located one foot off the r /w. 4. SSAR Regulations require that sidewalks shall be provided along both sides of the street in areas with a median lot size of one half acre or less. Sidewalks should be provided on both sides of Penn Park Lane. 5. Road B needs to provide parking on both sides, and should meet the Fire and Rescue requirements of 32 ft F /C- F/C. 6. An exception will be needed for the SSAR Multiple Connection Requirement. Please let us know if you have any questions, Thanks Megan Oleynik Engineering Intern VDOT- Culpeper District