Loading...
HomeMy WebLinkAboutSUB201300032 Review Comments Final Plat 2013-07-03Rj7VrANI� WATER & SEWER AUTHORITY :. FLOW ACCEPTANCE REVIEW Date: April 16, 2013 Project: Greyrock West Subdivision To: Albemarle County Service Authority 695 MOORES CREEK LANE CHARLOTTESVILLE, VA 22902 -9016 TEL: 434.977.2970 FAx:434.293.8858 WVWV.RIVANNA.ORG The Rivanna Water & Sewer Authority (RWSA) has reviewed a written request from the ACSA to accept up to 2,700 gallons average daily wastewater flow with a point of connection to the RWSA Crozet Interceptor at manhole CZI -MH -123. The increased wastewater is proposed by the ACSA to serve the Greyrock West Subdivision, which is comprised of 10 single family homes. These lots will be developed in the spring of 2013. We have reviewed the average daily flow of the RWSA systems that would receive this flow as proposed, and reviewed the appropriate design factors specified under the Virginia SCAT Regulations (9VAC 25- 790). On the basis of these reviews, under present average daily flow conditions, RWSA agrees to accept the additional wastewater flow as specified above. Please be advised that RWSA does not reserve capacity in its system for a specific project, and this letter should not be interpreted in any way as a reservation or allocation of flow or the granting of regulatory approval related to other agencies. Substantial changes in future average daily flow to the RWSA systems, changes in regulations, or other future factors could result in changes in RWSA's capability to accept additional flow. We strongly request that ACSA update RWSA on the status of this project on an annual basis, and further require that a new request for flow acceptance be made for all or any portion or phase of the above request for which sewer extension design has not been approved under a Certificate to Construct by the appropriate regulatory authority and is under construction within twenty - four months of the date of this letter. An updated review for flow acceptance shall be requested if the project's scope, time frame or connection point as initially specified changes. Please note that under no circumstances can a direct connection be made into RWSA's interceptor system without the written approval and physical inspection by the RWSA Engineering Department. Respectfully yours, V,- L/ Jennifer A. Whitaker, P.E. Chief Engineer