Loading...
HomeMy WebLinkAboutSDP201300011 Review Comments Major Amendment, Final Site Plan 2013-03-19�� OF A i" A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Old Trail Village Block 213: Rutherford Hotel SDP201300011 Plan preparer: Collins Engineering [tel 434- 293 -3719] Owner or rep.: Rutherford Hospitality, LLC Plan received date: 6 February 2013 Date of comments: 19 March 2013 Reviewer: Michael Koslow Review coordinator: JT Newberry The first initial site plan and comps submittal (SDP201300011) submitted 4 February 2013 has received Engineering Review and does not appear to meet Albemarle County minimum checklist items for approval. This review does not include a review of Erosion & Sediment Control or Stormwater Management. Please adequately address the following comments for initial site plan approval: A. Existing Conditions Information 1) Please identify existing 20' private drainage easement shown on sheet 5 by deed book and page number. Recommend same for existing 20' sanitary sewer easement shown on sheet 5; however this is an ACSA easement. B. Proposed Plan View Information 1) Please indicate a temporary grading easement or VDOT right of way permit for proposed entrance modifications along Claremont Lane in VDOT right of way. 2) Please either widen sidewalk along north end of parking lot to 6' or include bumper blocks for ten proposed adjacent parking spaces on sheet 4. 3) Please provide a number label for proposed 6" drain connecting proposed trench drain to EX- STR -26 on sheet 5. Engineering Review Comments Page 2 of 2 Please adequately address the following comments for final site plan approval: C. Application Information 1) Owner is required to provide a completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities (could reference an existing agreement with a comparison of proposed vs previously approved impervious surface). 2) Prior to final site plan approval, a separate set of Water Protection Ordinance plans must be approved including: stormwater management plan and erosion and sediment control plan (could reference an existing plan with a comparison of proposed vs previously approved impervious surface for SWM). 3) Prior to final site plan approval: water protection ordinance — erosion and sediment control and stormwater management and water and sewer bonds must be calculated by the county (water and sewer bonds are calculated by ACSA) and paid by owner after receipt of a Bond Request Form from owner (could reference an existing SWM bond or county accepted SWM facility with a comparison of proposed vs previously approved impervious surface). 4) Prior to final site plan approval, pro -rated share for this site which drains into Lickinghole Basin is required. D. Plan Detail information 1) Please provide traffic generation and distribution summary (ADT's). 2) Please provide calculations for pavement section thicknesses for the proposed entrance pavement section on sheet 4. 3) Please include sidewalk and dumpster pad details meeting requirements per 14- 422 and Albemarle County Design Standards Manual. E. Drainage Profiles 1) Please include drainage profiles for all proposed pipes and ditches. F. Drainage Computations 1) Please include drainage computations including for proposed trench drain outlet. Community Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow@albemarle.org to schedule an appointment.