Loading...
HomeMy WebLinkAboutWPO201200060 Review Comments Bond Estimate 2013-03-25Project Name Moore's Creek Wastewater Treatment Plant Nutrient Removal Improvements WPO file number: WP02012 -00060 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 stabl¢ation (PS, TS) 1.2 acres $5,000.00 $6,000.00 2 sift fence (SF) 530.0 ft $5.00 $2,650.00 3 safety fence (SAF) 0.0 ft $5.00 $0.00 4 diversion (DD, FD, RWD) 0 ft $13.00 $0.00 5 sift fence inlet protection (P) 3 $100.00 $300.00 6 check dam depth in channel 1 ft channel width loft 1 $225.00 $225.00 7 paved construction entrance 1 $3,500.00 $3,500.00 8 rip -rap, placed depth 1.83333333 ft length 12.0 ft width 1.8 (tons) 3.025 $60.00 $181.50 9 survey and layout (price per 0.1 mi.) acres 1.2 traps and basins 0 $600.00 10 mobilization $500.00 cost sum $13, 116 'o proj mgmt $2,093.48 contingency $1,605.00 Total $17,660 s \mkoslow \Documents \Current Reviews \WP0201200060 Moore's Creek WWTP Digester Improvements\2013- 03- 25 -BE- ESC- WPO2012 -00060 3/25/2013