Loading...
HomeMy WebLinkAboutSDP201300017 Review Comments Minor Amendment 2013-04-02Megan Yaniglos From: Megan Yaniglos Sent: Thursday, April 18, 2013 11:56 AM To: 'Paul Smith' Subject: FW: Charlottesville, VA - United Rentals Attachments: Site _ Plan_ -_ Application—Initial _ Plan _ and _Checklist.pdf; Site_ Plan_ -_ Application _Final_Plan_and_Checklist.pdf Paul: I sent this to you a couple weeks ago, but haven't gotten a response, so I wanted to make sure you have it. Thank you, Megan Yaniglos, ASLA Senior Planner Albemarle County Community Development Department Planning Services 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3004 fax: 434.972.4126 From: Megan Yaniglos Sent: Tuesday, April 02, 2013 10:14 AM To: 'Paul Smith' Subject: RE: Charlottesville, VA - United Rentals Paul: got the plans you submitted. However, there is a lot of information missing. You need to revise the plans to provide the information that I sent you before from the final and initial site plan checklists. As they are right now, they are incomplete. You need to pay particular attention to the requirements for the initial site plan. I have attached the checklists again for your reference. Let me know if you have further questions. Thank you, Megan Yaniglos, ASLA Senior Planner Albemarle County Community Development Department Planning Services 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3004 fax: 434.972.4126 From: Paul Smith [ mailto :psmith@smithbuildsit.com] Sent: Thursday, February 28, 2013 10:39 PM To: Margaret Maliszewski; Megan Yaniglos Cc: gtouchstone @smithbuildsit.com Subject: FW: Charlottesville, VA - United Rentals Margaret/ Megan, Hello. Hope ya'll had a good week so far. Attached is the latest imposed photo and latest elevation views. Please let me know if there is anything that needs to be added before I send them to you next week. Megan, I will be sending you the site plan and imposed site photo (GIS) as well. Thank you ladies for all you have done thus far! From: Chuck Hardin [ mailto :chardinses@bellsouth.net] Sent: Thursday, February 28, 2013 3:35 PM To: Paul Smith Subject: RE: Charlottesville, VA - United Rentals Latest. From: Paul Smith [ mai Ito: psmith @smithbuildsit.com] Sent: Wednesday, February 27, 2013 4:57 PM To: Chuck Hardin Subject: RE: Charlottesville, VA - United Rentals 40' width on the existing is measured wall to wall Same with the 60'x60' addition. Also, please add the 60' addition on the photo. Respectfully, Paul Smith Smith Construction Smith Consulting 4472 Martha Berry Highway Rome, GA 30165 706 - 232 -1299 Office 706 - 802 -7131 Cellular psmith&smithbuildsit. com From: Chuck Hardin [ mailto :chardinses @bellsouth.net] Sent: Wednesday, February 27, 2013 4:38 PM To: Paul Smith Subject: RE: Charlottesville, VA - United Rentals Paul, Is the 40' width on the existing measured from outside wall to wall or from eave to eave? Same with the new addition is it 60x60 wall dimensions or does the 60' go out to the eave? From: Paul Smith [ mailto :psmith(a)smithbuildsit.com] Sent: Wednesday, February 27, 2013 4:12 PM To: Chuck Hardin Subject: RE: Charlottesville, VA - United Rentals Respectfully, Paul Smith $Ln M- Q1 Smith Construction Smith Consulting 4472 Martha Berry Highway Rome, GA 30165 706 - 232 -1299 Office 706 - 802 -7131 Cellular psmith e_smithbuildsit.com From: Chuck Hardin [ mailto :chardinses(a)bellsouth.net] Sent: Wednesday, February 27, 2013 3:48 PM To: Paul Smith Subject: RE: Charlottesville, VA - United Rentals Ok, how does the canopy look? Is there something I need to add on that? From: Paul Smith [ mailto :psmith@smithbuildsit.com] Sent: Wednesday, February 27, 2013 3:25 PM To: Chuck Hardin Subject: RE: Charlottesville, VA - United Rentals Chuck, Can you add 2 doors on the new addition? Same size as the existing but space them evenly in the new addition. Respectfully, Paul Smith Smith Construction Smith Consulting 4472 Martha Berry Highway Rome, GA 30165 706 - 232 -1299 Office 706 - 802 -7131 Cellular psmith&smithbuildsit. com From: Chuck Hardin [ mailto :chardinses(abbellsouth.net] Sent: Wednesday, February 27, 2013 12:04 PM To: Paul Smith Subject: RE: Charlottesville, VA - United Rentals Paul, Attached is a first shot at the elevation of the building and also a photo with a canopy imposed. Take a look and comment. Thanks Chuck From: Paul Smith [mailto:psmith @smithbuildsit.com] Sent: Wednesday, February 27, 2013 9:20 AM To: Chuck Hardin Subject: Re: Charlottesville, VA - United Rentals That is what I need. I don't have a drawing at this point though. The existing building is about a 5 or 6:12 pitch so we will want to match it with the new addition. Where it becomes different is where the canopy meets the new addition and the existing shop. I think the canopy would function well under the existing eave but at a 1:12 or so pitch (due to the height of the shop doors. Where it connects to the new addition is where the trouble is. Let me know what you think. Respectfully, Paul Smith Smith Construction Smith Consulting On Feb 27, 2013, at 8:34 AM, "Chuck Hardin" <chardinses@bellsouth.net> wrote Paul, I think emails will work. Let me make sure I understand what you need. 1. The canopy imposed on the photo viewed from the road. 2. An elevation view of the shop with the canopy on it. Do you have drawings or details of the canopy? Chuck From: Paul Smith [ mailto :psmith(asmithbuildsit.com] Sent: Tuesday, February 26, 2013 6:44 PM To: Chuck Hardin Subject: Charlottesville, VA - United Rentals Chuck, Do you need me to stop by tomorrow and review the information with you? Let me know or we can email back and forth. Do you think I will be able to mail this (application with plans) out by Thursday? Thanks! Respectfully, Paul Smith <image001 Jpg> Smith Construction Smith Consulting 4472 Martha Berry Highway Rome, GA 30165 706 - 232 -1299 Office 706 - 802 -7131 Cellular psmith(@smithbuildsit.com