HomeMy WebLinkAboutSDP201300017 Review Comments Minor Amendment 2013-04-02Megan Yaniglos
From: Megan Yaniglos
Sent: Thursday, April 18, 2013 11:56 AM
To: 'Paul Smith'
Subject: FW: Charlottesville, VA - United Rentals
Attachments: Site _ Plan_ -_ Application—Initial _ Plan _ and _Checklist.pdf;
Site_ Plan_ -_ Application _Final_Plan_and_Checklist.pdf
Paul:
I sent this to you a couple weeks ago, but haven't gotten a response, so I wanted to make sure you have it.
Thank you,
Megan Yaniglos, ASLA
Senior Planner
Albemarle County Community Development Department
Planning Services
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
ph: 434.296.5832 x. 3004
fax: 434.972.4126
From: Megan Yaniglos
Sent: Tuesday, April 02, 2013 10:14 AM
To: 'Paul Smith'
Subject: RE: Charlottesville, VA - United Rentals
Paul:
got the plans you submitted. However, there is a lot of information missing. You need to revise the plans to
provide the information that I sent you before from the final and initial site plan checklists. As they are right
now, they are incomplete.
You need to pay particular attention to the requirements for the initial site plan. I have attached the checklists
again for your reference.
Let me know if you have further questions.
Thank you,
Megan Yaniglos, ASLA
Senior Planner
Albemarle County Community Development Department
Planning Services
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
ph: 434.296.5832 x. 3004
fax: 434.972.4126
From: Paul Smith [ mailto :psmith@smithbuildsit.com]
Sent: Thursday, February 28, 2013 10:39 PM
To: Margaret Maliszewski; Megan Yaniglos
Cc: gtouchstone @smithbuildsit.com
Subject: FW: Charlottesville, VA - United Rentals
Margaret/ Megan,
Hello. Hope ya'll had a good week so far. Attached is the latest imposed photo and latest elevation views. Please let me
know if there is anything that needs to be added before I send them to you next week. Megan, I will be sending you the
site plan and imposed site photo (GIS) as well.
Thank you ladies for all you have done thus far!
From: Chuck Hardin [ mailto :chardinses@bellsouth.net]
Sent: Thursday, February 28, 2013 3:35 PM
To: Paul Smith
Subject: RE: Charlottesville, VA - United Rentals
Latest.
From: Paul Smith [ mai Ito: psmith @smithbuildsit.com]
Sent: Wednesday, February 27, 2013 4:57 PM
To: Chuck Hardin
Subject: RE: Charlottesville, VA - United Rentals
40' width on the existing is measured wall to wall
Same with the 60'x60' addition.
Also, please add the 60' addition on the photo.
Respectfully,
Paul Smith
Smith Construction
Smith Consulting
4472 Martha Berry Highway
Rome, GA 30165
706 - 232 -1299 Office
706 - 802 -7131 Cellular
psmith&smithbuildsit. com
From: Chuck Hardin [ mailto :chardinses @bellsouth.net]
Sent: Wednesday, February 27, 2013 4:38 PM
To: Paul Smith
Subject: RE: Charlottesville, VA - United Rentals
Paul,
Is the 40' width on the existing measured from outside wall to wall or from eave to eave?
Same with the new addition is it 60x60 wall dimensions or does the 60' go out to the eave?
From: Paul Smith [ mailto :psmith(a)smithbuildsit.com]
Sent: Wednesday, February 27, 2013 4:12 PM
To: Chuck Hardin
Subject: RE: Charlottesville, VA - United Rentals
Respectfully,
Paul Smith
$Ln
M- Q1
Smith Construction
Smith Consulting
4472 Martha Berry Highway
Rome, GA 30165
706 - 232 -1299 Office
706 - 802 -7131 Cellular
psmith e_smithbuildsit.com
From: Chuck Hardin [ mailto :chardinses(a)bellsouth.net]
Sent: Wednesday, February 27, 2013 3:48 PM
To: Paul Smith
Subject: RE: Charlottesville, VA - United Rentals
Ok, how does the canopy look? Is there something I need to add on that?
From: Paul Smith [ mailto :psmith@smithbuildsit.com]
Sent: Wednesday, February 27, 2013 3:25 PM
To: Chuck Hardin
Subject: RE: Charlottesville, VA - United Rentals
Chuck,
Can you add 2 doors on the new addition? Same size as the existing but space them evenly in the new addition.
Respectfully,
Paul Smith
Smith Construction
Smith Consulting
4472 Martha Berry Highway
Rome, GA 30165
706 - 232 -1299 Office
706 - 802 -7131 Cellular
psmith&smithbuildsit. com
From: Chuck Hardin [ mailto :chardinses(abbellsouth.net]
Sent: Wednesday, February 27, 2013 12:04 PM
To: Paul Smith
Subject: RE: Charlottesville, VA - United Rentals
Paul,
Attached is a first shot at the elevation of the building and also a photo with a canopy imposed.
Take a look and comment.
Thanks
Chuck
From: Paul Smith [mailto:psmith @smithbuildsit.com]
Sent: Wednesday, February 27, 2013 9:20 AM
To: Chuck Hardin
Subject: Re: Charlottesville, VA - United Rentals
That is what I need. I don't have a drawing at this point though. The existing building is about a 5 or 6:12 pitch so we will
want to match it with the new addition. Where it becomes different is where the canopy meets the new addition and the
existing shop. I think the canopy would function well under the existing eave but at a 1:12 or so pitch (due to the height of
the shop doors. Where it connects to the new addition is where the trouble is.
Let me know what you think.
Respectfully,
Paul Smith
Smith Construction
Smith Consulting
On Feb 27, 2013, at 8:34 AM, "Chuck Hardin" <chardinses@bellsouth.net> wrote
Paul,
I think emails will work. Let me make sure I understand what you need.
1. The canopy imposed on the photo viewed from the road.
2. An elevation view of the shop with the canopy on it.
Do you have drawings or details of the canopy?
Chuck
From: Paul Smith [ mailto :psmith(asmithbuildsit.com]
Sent: Tuesday, February 26, 2013 6:44 PM
To: Chuck Hardin
Subject: Charlottesville, VA - United Rentals
Chuck,
Do you need me to stop by tomorrow and review the information with you? Let me know or we can email
back and forth. Do you think I will be able to mail this (application with plans) out by Thursday?
Thanks!
Respectfully,
Paul Smith
<image001 Jpg>
Smith Construction
Smith Consulting
4472 Martha Berry Highway
Rome, GA 30165
706 - 232 -1299 Office
706 - 802 -7131 Cellular
psmith(@smithbuildsit.com