Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201200060 Review Comments Bond Estimate 2013-04-01
Project Name Moore's Creek Wastewater Treatment Plant Digester Improvements WPO file number: WP02012 -00060 Erosion and Sediment Control Bond Estimate Item Item Number 1 stabl¢ation (PS, TS) 2 sift fence (SF) 3 safety fence(SAF) 4 diversion (DD, FD, RWD) 5 sift fence inlet protection (P) 6 check dam depth in channel 7 paved construction entrance 8 rip -rap, placed depth width 9 survey and layout (price per 0.1 mi.) acres 10 mobilization No. Unit Unit Cost Cost (installed) Total $17,660 s \mkoslow \Documents \Current Reviews \WP0201200060 Moore's Creek WWTP Digester Improvements\2013- 04- 01 -BE- ESC- WPO2012 -00060 4/1/2013 1.2 acres $5,000.00 $6,000.00 530.0 ft $5.00 $2,650.00 0.0 ft $5.00 $0.00 0 ft $13.00 $0.00 3 $100.00 $300.00 1 f channel width loft 1 $225.00 $225.00 1 $3,500.00 $3,500.00 1.83333333 ft length 12.0 ft 1.8 (tons) 3.025 $60.00 $181.50 1.2 traps and basins 0 $600.00 $500.00 cost sum $13, 956'' prof mgmt $2,093.48 contingency $1,605.00 Total $17,660 s \mkoslow \Documents \Current Reviews \WP0201200060 Moore's Creek WWTP Digester Improvements\2013- 04- 01 -BE- ESC- WPO2012 -00060 4/1/2013