Loading...
HomeMy WebLinkAboutSUB201000060 Review Comments Bond Inspection 2013-04-25��RGYN�A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 24 Apr 2013 Charles Hurt North Pantops Townhouses, LLC 195 Riverbend Drive Charlottesville, VA 22911 Re: Pavilions at Pantops Phase III Bond Inspection Request (SUB201000060) Recalculated bond amount: $870,350 I reviewed the bond reduction request. Unfortunately, I cannot complete the bond reduction at this time due to the following comments: 1. It appears the files sent to the county are utility as- builts and sanitary sewer photos, but not the required road as- builts and drainage videos. Please provide. See the attached Albemarle County As- builts Road Plan Policy as a guideline. Also see the list of required tests that may or may not have been provided: a. California Bearing Ratio (CBR) tests b. stone depth inspections, including installation of under- drains and cross - drains, c. fill compaction tests, d. pipe and drainage structure video inspections or equivalent, e. base and surface pavement inspections, documenting materials, thickness and compaction f. concrete tests 2. It appears that a CBR tests fall below 6. Please show revised pavement design to accommodate the low CBR on as- builts. 3. It appears that you are proposing a bond reduction request for all roads on site. The CBR test locations do not follow VDOT Standards. Please see below. a. For streets less than 200 feet in length, one soil sample for conducting AASHTO soil classification and CBR test is required. b. For streets 200 to 500 feet in length, at least two soil samples for conducting AASHTO soil classification and CBR tests is required, which includes one at each intersection of an existing state road. C. For longer streets, one soil sample shall be taken at each intersection with an existing state road plus one test sample every 500 feet in length, or portion thereof, is required for conducting AASHTO soil classification and CBR tests. We will gladly reimburse you for the fee or hold it for your next submittal when the correct as- builts are submitted. Sincerely, MQ"de__ Michelle Roberge