Loading...
HomeMy WebLinkAboutWPO201300005 Review Comments Bond Estimate 2013-04-17Kings Grant WPO file number: WP0201300005 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) 1 temporary sediment basin (SB) 2 temporary sediment basin (Sal 3 temporary sediment basin (SB) sift fence inlet protection (IP) stone inlet protection (IP) height of dam at toe height of dam at face length of dam top width (comp. fill Vol) length of spillway width of spillway riser height riser diameter barrel length barrel diameter barrel collars height of dam at toe height of dam at face length of dam top width (comp. fill Vol) length of spillway width of spillway riser height riser diameter barrel length barrel diameter barrel collars height of dam at toe height of dam at face length of dam top width (comp. fill Vol) length of spillway width of spillway riser height riser diameter barrel length barrel diameter barrel collars outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) length of cut wash rack 10 ft paved construction entrance 150 ft rip -rap, placed depth 900.0 cy width survey and layout (price per 0.1 mi.) acres mobilization (spillway stone tons) stream crossing (computed independently) Off 24 ft cut at dam 0 ft 7 ft cut at high side 6 ft 200 ft length of cut 50 ft 10 ft width of cut 150 ft 11022.2 cy (cut voq 900.0 cy 130 ft toy est) 11322.2 loft (spillway stone tons) 195 Off 0 in (riser unit price) $0.00 80 ft (price of base) $200 15 in (barrel unit price) $35.00 2 baffle length 5 ft 27 ft cut at dam 0 ft 15 ft cut at high side 0 ft 180 ft length of cut 0 ft 24 ft width of cut 0 ft 18900.0 cy (cut Vol) 0.0 cy 130 ft (cy est) 18900.0 loft (spillway stone tons) 195 Off 0 in (riser unit price) $0.00 120 ft (price of base) $200 15 in (barrel unit price) $35.00 3 baffle length 20 ft 12 ft cut at dam 0 ft e ft cut at high side 0 ft 60 ft length of cut 0 ft 24 ft width of cut 0 ft 1688.9 cy (cut Vol) 0.0 cy 0 ft (cy est) 1688.9 0 ft (spillway stone tons) 0 6 f 60 in (riser unit price) $0.00 16 ft (price of base) $200 36 in (barrel unit price) $70.00 2 baffle length 15 ft 15 ft width loft 0 ft width loft 0 ft channel width loft 2 ft length 1.0 ft 1.0 (tons) 0.15 1 traps and basins 2 No. Unit Unit Cost Cos $0.00 (installed) $0.00 5.0 acres $5,000.00 $25,000.00 2500.0 ft $5.00 $12,500.00 0.0 ft $5.00 $0.00 540 ft $13.00 $7,020.00 $13.00 $50.00 $156,938.89 $13.00 $50.00 $255,450.00 $13.00 $50.00 $21,955.56 $1,500.00 $500.00 cost sum $497,968.44 proj mgmt $74,695.27 contingency $57,266.37 Total $629,940 4/17/2013 $2,020.00 0 $100.00 $0.00 0 $200.00 $0.00 1 $675.00 $675.00 $0.00 1 $0.00 $0.00 1 $2,000.00 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $1,500.00 $500.00 cost sum $497,968.44 proj mgmt $74,695.27 contingency $57,266.37 Total $629,940 4/17/2013