HomeMy WebLinkAboutSP201300002 Review Comments Special Use Permit 2013-04-26Phone 434 - 296 -5832
Memorandum
To: Margaret Maliszewski
From: Michelle Roberge
Division: Engineering
Date: February 19, 2013
Rev1: April 1, 2013
Rev2: April 25, 2013
Subject: SP 2013— 00002 Price Hyundai
Fax 434 - 972 -4126
have reviewed the concept plan for SP2013 -02, Price Hyundai. Please see below for my comments and
recommendations.
1 L%-.vnnucuLJ ricaZ'c P1�- .....c t-uiu GilIU a ___. ivi uavcivvay uci III iu uius.
Rev1: Comment acknowledged by the applicant and will be addressed with the site plan.
2) [Comment] In the middle section of parking lot, please provide 9'x 18' parking stalls.
Kevl: Applicant acknowledged comment and stated that parking with 2' overhang will be
addressed with the site plan. The applicant claims the 2' overhang will be unobstructed by
the retaining wall. It will be difficult to achieve exactly 1' width retaining wall. In addition,
three (3) proposed light poles will obstruct the 2' overhang. I recommend the applicant
rncnivo fhic icciin nrinr fn SP nnnrnval cinro it may imnarf nnrkinn cnnrnc
Rev2: Applicant submitted a detail of the retaining wall. The wall is staggered and will
occupy a total of 1' -5" and not the 1' that was originally proposed. Also, the 2' overhang
shown on the plan includes the curb width, but the 2' overhang should be measured
behind the curb. The applicant does not meet the 2' overhang on both sides of the
retaining wall due to the restricted space available. See my attached detail.
3) [Comment] Please address the runoff north of site for the quality and quantity criteria.
Comment acknowledged by the!,- " —nt and will be addressed with the site plan.
4) [Comment Rev 2] The travelway behind the bldg only meets our one way lane. It appears a
two way travelway will work if the tree is removed or the bldg footprint is reduced.
5) [Comment Rev 2] The applicant shall avoid the bldg footings where the cantilever retaining
walls are located. It does not appear the retaining walls are designed. Please show
design. I recommend using Redi Rock gravity retaining walls to reduce space required for
wall. The design of Redi Rock walls can be verified at site plan phase since space required
is reduced.
For further information, please contact Michelle Roberge in the Engineering Department
mroberge @albemarle.org or 434 - 296 -5832 ext. 3458.
m
1�"
/a''
�j Ts
hou vin mrt
2 ` overhavi shy " - nlD+- C� A- Cuirb .
t 4- 6s cm, b
rr
(In� -''nn a i