Loading...
HomeMy WebLinkAboutWPO201300025 Review Comments Bond Estimate 2013-05-06Sediment & Erosion Control Plan for Shared Driveway Serving Lots A& B a Division of Tax Map 56 Parcel 100 The Property of S. Daley Craig, WPO file number: WP0201300025 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stablization (PS, TS) 1.3 acres $5,000.00 $6,500.00 sift fence (SF) 850.0 ft $5.00 $4,250.00 safety fence (SAF) 30.0 ft $5.00 $150.00 diversion (i F0, 1 0 ft $13.00 $0.00 temporary slope drain (1si pipe length 0 ft pipe diameter 0 in $0.00 $0.00 1 temporary sediment trap (ST or CIP) Method for volumE height of dam at toe 2.5 ft cut at dam 3 ft (tenth) x (total widt height of dam at face 5.5 ft cut at high side 3 ft assume face at 2: length of dam 18 ft length of cut 12 ft total width = 3x(tof top width 2.5 ft width of cut 5 ft average height = (camp. fill -1) 56.0 cy (cut vol) 22.7 cy $13.00 length of spillway 5 ft (cy est) 63.6 width of spillway 1.3 ft (spillway stone tons) 0.72222 $50.00 $862.33 2 temporary sediment trap (ST or C IP) Method for volumE height of dam at toe 2.5 ft cut at dam 3 ft (tenth) x (total widt height of dam at face 5.5 ft cut at high side 3 ft assume face at 2: length of dam 18 ft length of cut 12 ft total width = 3x(toE top width 2.5 ft width of cut 7 ft average height = (comp. fill WI) 56.0 cy (cut vol) 25.3 cy $13.00 length of spillway 5 ft (cy est) 64.4 width of spillway 1.5 ft (spillway stone tons) 0.83333 $50.00 $879.44 3 temporary sediment trap(STor CIP) Method for volumE height of dam at toe 3 ft cut at dam 4 ft (tenth) x (total widt height of dam at face 6 ft cut at high side 4 ft assume face at 2: length of dam 31 ft length of cut 31 It total width = 3x(tof top width 2.5 ft width of cut 19 ft average height = (comp. fill vol) 121.4 cy (cut vol) 160.7 cy $13.00 length of spillway 6 ft (cy est) 201.2 width of spillway 5.4 ft (spillway stone tons) 3.6 $50.00 $2,795.77 sift fence inlet protection (IP) 0 $100.00 $0.00 stone inlet protection (IP) 0 $200.00 $0.00 outlet protection (OP) length loft width 5 ft 2 $225.00 $450.00 channel (SCC, matted) length 0 ft width 0 ft $0.00 check dam depth in channel 0 ft channel width 0 ft 1 $0.00 $0.00 construction entrance (CE) 1 $2,000.00 $2,000.00 wash rack $2,000.00 paved construction entrance 0 $3,500.00 $0.00 rip -rap, placed depth 2 ft length 1.0 ft width 1.0 (tons) 0.15 $60.00 $9.00 survey and layout (price per 0.1 mi.) acres 1 traps and basins 2 $1,500.00 mobilization $500.00 stream crossing (computed independently) cost sum $19,896.55 proj mgmt $2,984.48 contingency $2,288.10 Total $25,170 5/1/2013